Similar Projects
HVAC Unit and HVAC Precision Unit Maintenance and Repair
Renovation
Sub-Bidding
$437,000 CJ est. value
Pompano Beach, FL 33060

FY22-202 - HVAC Installation and Refurbishment
Term Contract, Alteration
Post-Bid
FL

AC Replacement and Relocation
Alteration
Post-Bid
Davie, FL 33330

Central HVAC Plumbing Renovations
Alteration
Results
Fort Lauderdale, FL 33311

911 Call Center Equipment Room HVAC Renovation
Alteration
Results
$450,000 est. value
Coral Springs, FL 33065

District 4 - District Four Broward Operation Center Removal and Replacement of Air Conditioning Unit
Alteration
Post-Bid
$113,700 est. value
Fort Lauderdale, FL 33309

AC Chiller System Replacement at District 4 Wastewater Treatment Plant
Alteration
Results
$211,482 est. value
Pompano Beach, FL 33069

Heating, Ventilation and Air Conditioning Replacement - North Region
Alteration
Post-Bid

Cooling Tower Water Treatment Services
Alteration
Results
Fort Lauderdale, FL 33315

I.T. Parker Community Center HVAC Replacement
Alteration
Post-Bid
Dania Beach, FL 33004

UPS Rack Cooling System Preventative Maintenance and Repair Services
Term Contract, Alteration
Results
FL

Air Conditioning Filters
Term Contract
Post-Bid
FL

Preventative Maintenance and Repair of Bioclimatic Units
Alteration
Results
Fort Lauderdale, FL 33312

Air Conditioning and Refrigeration Equipment Maintenance and Replacement
Term Contract
Post-Bid
$142,000 est. value
Pompano Beach, FL 33069

Pre-Qualified List for HVAC Contractors
Term Contract, Alteration
Results
Pompano Beach, FL 33069

Last Updated 02/14/2023 08:32 AM
Project Title

i-UV Upgrade in Air Conditioning System

Physical Address View project details and contacts
City, State (County) Davie, FL 33328   (Broward County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

UV Upgrade in Air Conditioning System The Informal Quoting process is used when the Town estimates the total bid amount not to exceed F.S. 287.017(2), as amended. Complete bid specifications are enclosed. Any questions pertaining to this specification should be addressed to procurement@davie-fl.gov by February 21st, 2023 at 2:00 PM EST. The Town of Davie reserves the right to reject any and/or all bids. The purpose of this ITQ is to upgrade the Carrier i-Vu system to i-Vu Standard/Plus v7.0 Security used to monitor air conditioning systems located in the Public Works/Fire Administration building, Potters Park Community Center, and The Davie Police Department Buildings. This will also include an upgrade of the integration link and the RTUs to BACnet protocol. 1. Supply and installation of Carrier i-Vu Standard/Plus v7.0 Security software. 2. Upgrade software in PC workstation. 3. Integration and setup of the following buildings into new Carrier i-Vu interface. o Potters Park Community Center 4300 SW 57 th Terrace, Davie, FL 33314. o Davie Police Department Building 1230 South Nob Hill Road, Davie, FL 33324. o Public Works/Fire Administration Building 6901 Orange Drive Davie, FL 33314. 4. Supply and install low voltage control wiring and terminations. 5. Provide Owner training (up to 8 hours of training and/or technical assistance). 6. Programming, start-up, and commissioning of control system. 7. Remove existing Carrier Control System 3rd party equipment interface "link" (CCN Network). 8. Supply and installation of new Carrier Control System 3rd party equipment interface "link" (BACnet Network) - install new link into existing enclosure using existing power 9. Supply and installation of BACnet translators for existing RTUs (UPC) - 2 total. 10. Supply and installation of network surge protection devices for RTUs - 2 total. 11. Supply and installation of Low voltage control wiring and terminations. 12. Install floor plan graphics for the Police Department Building (1 ST and 2 nd floors). 13. Programming, start-up, and commissioning of new system components. 14. One (1) year warranty on Carrier Controls, parts, and installation labor. 15. Provide operation and maintenance manuals.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents