Similar Projects
Desmet Road Pedestrian Trail Project
Alteration
Post-Bid
Plummer, ID

Wildlife Overpass at Cervidae Peak, MP
Term Contract
Results
$3,000,000 to $5,000,000 est. value
Boise, ID 83716

Alturas Water System Improvement & Cabin Creek Drainage Restoration Project On The Sawtooth National Forest
Term Contract
Design
$250,000 to $500,000 est. value
Stanley, ID 83278

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Constructing a Stiff Leg Culvert on SH-21 MP 123
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

US-20, D3 Culvert Repair
Infrastructure
Results
$100,000 to $500,000 est. value
ID

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

Roads and Bridges
Alteration
Results
$1,000,000 to $2,500,000 est. value
ID

Culvert Replacement
Infrastructure
Post-Bid
Nampa, ID 83687

Esther Simplot Pond Outlet
Infrastructure
Results
$375,000 est. value
Boise, ID 83702

Molenaar Park Splash Pad Utilities
New Construction, Alteration
Results
Boise, ID

Widen the Roadway to a Two-lane Urban Road With Bicycle Lanes, Turn Lanes, Storm Drainage Improvements
Infrastructure
Results
ID

Pipe and Guardrail Replacement
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Pipe and Guardrail Replacement
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Last Updated 04/06/2022 02:21 PM
Project Title

Tom Beall Road Slide Repair

Physical Address View project details and contacts
City, State (County) Lapwai, ID 83540   (Nez Perce County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of contractor provided design and repair of the slide and roadway repaving tempmargin; MSE Retaining Wall Welded Wire: approximate length 80 feet. Temporary shoulder build-up with drainage: 25 tons Repaving: 27 tons Guardrail Installation

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents