Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station 1 Remodel
Renovation
Conception
$2,000,000 est. value
San Marcos, TX 78666

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

Fire Station #43
New Construction
Design
$5,000,000 est. value
Fort Worth, TX

Fire Station #2 Repairs
Renovation
Bidding
Pearland, TX

Fire and EMS Facility
New Construction
Sub-Bidding
TX

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

Haltom City Fire Station 3
New Construction
Post-Bid
Haltom City, TX 76117

Temporary Buildings and Dome Structures
New Construction - 7,700 SF
Results
$145,196 est. value
Dallas, TX 75230

Fire Station 24 Replacement Project
New Construction, Term Contract - 16,270 SF
Results
Less than $5,900,000 est. value
San Antonio, TX 78200

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Police Headquarters and Fire Station #2 and Administration Buildings
New Construction - 73,273 SF
Construction
Less than $19,700,000 est. value
Huntsville, TX 77340

Fire Station #7
New Construction - 14,300 SF
Pending Verification
Pearland, TX

Police Training Center
Renovation - 1,700 SF
Pending Verification
Pearland, TX

Fire Station 3 Remodel
Renovation
Conception
San Marcos, TX 78666

Last Updated 02/14/2022 09:59 AM
Project Title

New Police Department and Fire Station #1

Physical Address View project details and contacts
City, State (County) Lewisville, TX 75057   (Denton County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Obtained from a credible source, Awaiting verification, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $96,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The new complex will replace the current Police Department building and Fire Station #1 near the northwest corner of Main Street and Valley Parkway. The new facility also will include a hardened emergency operation center able to withstand tornado-force winds and include backup generator power sufficient to prevent prolonged power losses. Fire Station #1 will be expanded from three apparatus bays to five to accommodate equipment and staff in support of future growth. A two-story parking garage will provide secured parking and building access for police and fire employees and provide protected parking for special-unit vehicles that often are parked unsecured currently.

Details

Fire/Police Station, 116,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents