Similar Projects
Barr Hammock Timber Sale
Bidding
FL

Disaster Debris Monitoring Services
Term Contract
Post-Bid
Gainesville, FL 32606

Emergency and Rapid Response Service (ERRS)
Post-Bid

Lake Alto South 2019 Timber Sale
Results
Less than $31,805 est. value
Waldo, FL 32694

Annual Wood Waste Processing
Term Contract
Results
Less than $35,000 est. value
Gainesville, FL 32601

Disaster Recovery and Remediation Services/Debris Monitoring
Term Contract
Post-Bid
FL

Waste Stream Handling Solutions
Term Contract
Results
Gainesville, FL

Salvage/Scrap Metal and Equipment
Post-Bid
Gainesville, FL 32609

Annual Roadway Construction Material Hauling Services
Term Contract
Results
Gainesville, FL 32601

Goethe Forest Wide 20/21 Timber Sale
Post-Bid

Annual E-Scrap Disposal
Term Contract
Results
Gainesville, FL 32601

Woody Waste Loading and Hauling
Term Contract
Post-Bid
Gainesville, FL

Emergency Cut and Toss
Results

Salvage/Scrap Metal and Equipment
Post-Bid
Gainesville, FL 32609

Emergency Cut and Toss
Results

Last Updated 11/13/2019 02:22 PM
Project Title

S--Services: Cardboard Recycling Service

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32608   (Alachua County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor is responsible for providing all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform cardboard recycling services at the North Florida/South Georgia Veterans Health System (NF/SGVHS). The Contractor is responsible for performing to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are located in section 9 below. Off-Site Recycling. The Contractor shall transport and dispose of all recyclable cardboard materials. The Contractor shall be responsible for any permits or fees associated with the use of off-site disposal locations or marketing centers.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents