Similar Projects
Last Updated | 02/18/2022 11:04 AM |
Project Title | New Backflow Preventer/Meter Vault and Appurtenance |
Physical Address | View project details and contacts |
City, State (County) | Hamilton, MA (Essex County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $105,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work includes the construction of a new pre-cast concrete vault at the intersection of Mudge Avenue and Lee Park in Hamilton, MA to house a new 6-inch backflow preventer, 6-inch compound service meter, 6-inch flanged ductile iron piping and appurtenances. The work also includes the installation of new 6-inch ductile iron pipe, gate valves and fittings to connect the new vault piping to the existing water main, new copper water service, site restoration, and the demolition and removal of an existing 4-foot diameter block meter chamber, water meter, water service and curb box, and associated piping. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |