Similar Projects
Water Meter Installation Program
Infrastructure
Bidding
Lynn, MA

Install Commercial Water Meters in Brooksby Village
Post-Bid
Less than $95,000 est. value
Peabody, MA 01960

Highland Avenue Water Lining
Post-Bid
Less than $600,000 est. value
Salem, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Market Street Utility Project
Results
Less than $700,000 est. value
Ipswich, MA 01938

Advanced Metering Infrastructure (AMI) Replacement
Infrastructure
Post-Bid
Ipswich, MA

2020 Chandler Road Water Improvements
Results
Less than $800,000 est. value
Andover, MA 01810

Ductile Iron Pipe
Infrastructure
Post-Bid
Beverly, MA

Furnish and Install Metron-Farnier Spectrum 500D Water Meters
Results
Ipswich, MA

Purchase of Water Meters
Term Contract
Results
North Andover, MA

Contract 2 - 2020 Water Main Improvements
Results
Less than $3,400,000 est. value
Andover, MA 01810

Gloucester Dams Gatehouse Improvements
Results
Less than $790,000 est. value
Gloucester, MA

Water Meters and Related Hardware
Results
Less than $180,000 est. value
Gloucester, MA

Water and Sewer Supplies
Term Contract
Results
$340,000 est. value
Lawrence, MA

Water and Sewer Supplies
Results
Lawrence, MA

Last Updated 02/18/2022 11:04 AM
Project Title

New Backflow Preventer/Meter Vault and Appurtenance

Physical Address View project details and contacts
City, State (County) Hamilton, MA   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $105,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a new pre-cast concrete vault at the intersection of Mudge Avenue and Lee Park in Hamilton, MA to house a new 6-inch backflow preventer, 6-inch compound service meter, 6-inch flanged ductile iron piping and appurtenances. The work also includes the installation of new 6-inch ductile iron pipe, gate valves and fittings to connect the new vault piping to the existing water main, new copper water service, site restoration, and the demolition and removal of an existing 4-foot diameter block meter chamber, water meter, water service and curb box, and associated piping.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents