Similar Projects
ARPA Water Distribution for Black Bayou Water Association
Infrastructure
Bidding
$1,800,000 CJ est. value
Greenville, MS 38702

ARPA Water Distribution for Black Bayou Water Association
Infrastructure
Bidding
$1,800,000 CJ est. value
Greenville, MS 38702

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Runway 18L-36R Rehabilitation Project
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Greenville, MS 38701

Railcar Bridge and Finishes
Infrastructure
Results
$77,355 CJ est. value
Leland, MS 38756

Breisch Street Bridge Improvements
Infrastructure
Results
$979,230 CJ est. value
Leland, MS 38756

New Restrooms for: South Washington County Multiplex
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Hollandale, MS 38748

Potable Water System Improvements Phase 3A
Infrastructure
Post-Bid
$550,000 CJ est. value
Greenville, MS 38703

Comprehensive Sanitary Sewer Improvements Project - Contract No. 3B Pump Station Improvements Phase Two
Renovation, Infrastructure
Results
$3,127,060 CJ est. value
Greenville, MS 38701

ESSER III Improvements for Webb Elementary
Infrastructure
Bidding
$470,000 CJ est. value
Greenville, MS 38701

Dollar General #24626 - North Broadway / Greenville
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Greenville, MS 38701

Stadium Improvements
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Leland, MS 38756

Home Grant Program
Infrastructure
Post-Bid
$12,000 CJ est. value
Metcalfe, MS 38760

Sewage Line Repair
Infrastructure
Post-Bid
$500,000 CJ est. value
Greenville, MS 38701

Comprehensive Sanitary Sewer Improvements Project - Contract No. 11 2021 Sanitary Sewer Rehabilitation
Infrastructure
Post-Bid
$14,533,731 CJ est. value
Greenville, MS 38701

Last Updated 12/26/2023 09:31 AM
Project Title

Water Meter Replacement Project

Physical Address View project details and contacts
City, State (County) Greenville, MS 38703   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,148,450 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Removal of existing AMI water metering system, including documentation, boxing, storing and transporting meters to the City's storage facility, and the installation of City furnished AMR water metering system throughout the City of Greenville's water service area. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:A. Project Engineer - Marcus E. Hooker, Jr., PE, PLS Mail - P.O. Box 368, Greenville, MS 38701 Email - mhjr@hookerengineering.com Fax - 662-334-1871 Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 am to 5:00 pm, and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. The Bid Schedule may be examined at the following location: Mississippi Procurement Technical Assistance Program (MPTAP), Mississippi Development Authority, Minority & Small Business Development Woolfolk Building, 501 North West Street, Suite B 01, Jackson, MS 39201, 601-359-3448 and Northwest MS Contract Procurement Office, 7075 Golden Oaks Loop W., Suite 12, Southaven, MS 38671, 662-439-2379. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The City of Greenville reserves the right to waive any informality or to reject any or all bids. Contract award will be made to the responsible offeror whose proposal is most advantageous to the City of Greenville. The City of Greenville is an equal opportunity employer. No Bidder may withdraw his bid within 60 calendar days after the date of the bid opening.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents