Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Y- Design-Build (DB) Indefinite-Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC)
Design
$4,000,000 to $249,000,000 est. value

Design Build and Design Bid Build Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for the NAVFAC SE Area of Responsibility
New Construction, Renovation, Demolition
Post-Bid
$4,000,000 to $20,000,000 est. value

Mynatt Park Tennis Court Resurfacing
Results
Gatlinburg, TN 37738

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Reported 04/14/2021 12:00 AM
Project Title

Community Center ADA Upgrades

Physical Address View project details and contacts
City, State (County) Gatlinburg, TN 37738   (Sevier County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Parking Lot: Demolition to the sidewalk and asphalt Replace two (2) existing accessible parking spaces with three (3) ADA (2010 Standards 208.2) approved handicapped parking spaces in front of the Bowling Alley, where the existing handicapped spaces are currently Debris Removal Reconfigure, form, and pour new section of sidewalk with ADA compliant ramp from said ADA parking spaces and compliant van accessibility Install three (3) ADA compliant parking signs Install detectable warning pads, curb guards and handrails where required by the ADA code Replace soil, grass and asphalt damaged from construction Interior: Men’s and Women’s Restrooms by Main Check-in Office Remove existing ceramic tile from both the walls and floors Remove partitions Prep floors and walls for tile Furnish thin set and grout Furnish and install tile on floors and walls, approximately 774 sq ft Re-Install toilet paper holder, soap dispensers, paper towel holders, baby changing station’s, and grab bars where required by the ADA requirements Remove portion of block walls to allow for ADA compliance Remove one (1) Urinal to allow for proper ADA accessibility Remove and replace ceiling tiles and rework grid systems Reattach all plumbing fixtures with new supply lines Re-install existing partition Install new countertop and sink Install new light fixtures Paint on walls, two (2) coats

Details

Misc. Buildings, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents