Similar Projects
Central Campus Electrical Upgrade Phase 2 Distribution
Post-Bid
$6,000,000 est. value
Raleigh, NC 27607

High Point Parking Deck Lighting Replacement
Post-Bid
High Point, NC 27260

Annual Construction Service Contract for Underground Distribution Construction
Term Contract
Results
Less than $1,000,000 est. value
Fayetteville, NC

34.5-12.47/7.2 kV Substation Switching Facilities and Accessories
Results
Washington, NC

Detention Center Switchgear Upgrades
Post-Bid
Castle Hayne, NC 28429

Electrical Services
Results
Charlotte, NC

Booker Dairy Road North Feeder New Overhead Addition
Addition
Post-Bid
Smithfield, NC 27577

Taxiway Lighting and Signage
Results
Less than $743,576 est. value
Gastonia, NC 28056

115 kV - 24.94/14.4 kV Substation Switching Facilities
Post-Bid
Statesville, NC

Generator Service Contract
Term Contract
Results
Less than $22,944 est. value
Angier, Cameron, Fuquay-Varina, Lillington, NC 27546

Replacement Emergency Generator
Post-Bid
Kinston, NC 28502

Residential Electrical Services
Results
Concord, NC

2019 Electric Distribution Line Upgrade for the Water Plant High Service Pump Station
Post-Bid
Shelby, NC

Judge E. Maurice Braswell Cumberland County Courthouse Generator Replacement
Results
Less than $2,737,200 est. value
Eastover, NC 28301

Low Voltage Wiring
Post-Bid
Albemarle, NC 28001

Last Updated 10/01/2020 03:05 PM
Project Title

Z2DA--Power Distribution System Upgrade

Physical Address View project details and contacts
City, State (County) Durham, NC   (Durham County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project #558-18-277 Upgrade Power Distribution System The Department of Veterans Affairs, 508 Fulton Street, Durham, NC has a requirement for a contractor to provide all labor, material, supplies, equipment, transportation, permits, license and qualified supervision for Project 558-18-277, to upgrade the power distribution system at the Chiller Plant at Building 9 Durham VA Medical Center, Durham, NC. General Scope: The contractor shall replace the primary switch assemblies transformers, and distribution equipment in the same location with demolition/removal and replacement of the existing components. The contractor shall provide phasing coordination for each section below to minimize impact to normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. The contractor will be required to provide alternate power source to meet existing power requirements to minimize operation at reduced capacity without services. The construction for this project will cover the following but not limited to: 1. Provide a double ended 2000 KVA substation. Provide new medium voltage terminal cabinet. Provide new 15KV primary switchgear with transformer overload protection. Provide two new 2000 KVA 12470/ 480/277v transformers. Provide two 3200A 480V breakers. Provide proper electrical (demand) metering on the secondary of transformers. Provide one 3200A 480V 50KAIC tie breaker switch. Provide five new 1600A 480V draw out breakers and reconnect to existing lines 2. Provide a new 1500 VA 120V UPS device for the chiller control panel. Provide new raceway with circuit in B9MCC. Provide spare breaker for UPS circuit. Install UPS system on wall adjacent to control panel. 3. Provide new Medium Voltage terminal cabinet with lockable latch, Barfield MF BGSSE236730TP with 15KV load breaking junction, 2 Three way (cooper 500-15) or equal.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents