Similar Projects
Water Station Electrical Improvements - Pump and Motor Replacement - All Stations
Infrastructure
Conception
$2,566,741 est. value
Schaumburg, IL

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

Replace Pump 8 and Install New VFD for Pump 13 at the Touhy Avenue Pump Station
Infrastructure
Post-Bid
Niles, IL 60714

Water Treatment Plant High Service Pump Replacement
Results
Chicago, IL

CPS Burbank ES Chilled Water Pump Replacement
Renovation
Results
Chicago, IL 60639

Well Sealing Villa Santa Maria Convent
Infrastructure
Post-Bid
Less than $25,000 est. value
Oak Forest, IL 60452

CPS Walt Disney Magnet Ejector Pump Loading Dock Replacement
Results
Chicago, IL 60613

Inspection, Preventative Maintenance, Repair, Replacement of VFD Pumps
Term Contract, Infrastructure
Post-Bid
Chicago, IL

CPS Haines ES Booster Pump Replacement
Term Contract
Results
Chicago, IL 60616

Pump Preventative Maintenance and As-Needed Repairs
Term Contract
Post-Bid
Glenview, IL

Water Supply Well No. 4 Abandonment
Infrastructure
Results
Mount Prospect, IL

Pentair Hydromatic Pumps
Infrastructure
Post-Bid
Chicago, IL

Inspection, Maintenance and Repair of Lysimeters and Groundwater Monitoring Wells
Infrastructure
Results
$36,000 est. value
Chicago, IL

Water Supply No. 17 Rehabilitation
Infrastructure
Post-Bid
Mount Prospect, IL

Pulling, Repairing, and Reinstallation of Pumping Unit in Well
Infrastructure
Results
Elgin, IL

Last Updated 06/28/2022 01:19 AM
Project Title

Water Well No. 9 Rehabilitation

Physical Address View project details and contacts
City, State (County) Elk Grove Village, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Elk Grove Village will receive sealed bids for the Water Well No. 9 Rehabilitation project and all incidental and collateral work necessary to complete the project within Village limits as described in the Specifications and Contract Document PW-2223-07. Prospective bidders are advised to carefully review the General Conditions, Special Conditions, and Special Provisions of this document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents