Similar Projects
Brandeis International Business School
Addition
Conception
Waltham, MA 02453

Linsley Roof Renovation Framingham State University - General Bids
Renovation
Bidding
$600,000 est. value
Framingham, MA 01702

Peirce and Mann Halls Fire Pump - Filed Sub Bids
Renovation
Sub-Bidding
$125,000 est. value
Framingham, MA

Linsley Roof Renovation Framingham State University - Filed Sub Bids
Renovation
Sub-Bidding
$600,000 est. value
Framingham, MA 01702

Mass. Bay Community College - Health Science Center
New Construction - 71,000 SF
Post-Bid
Less than $40,000,000 est. value
Framingham, MA 01702

Costello Center Renovation Basketball Lockers
Renovation
Post-Bid
Lowell, MA

Biotechnology Facility, Talbot Building - Filed Sub Bids
Results
$2,894,503 est. value
Bedford, MA

Perry Hall Room 404 Fraunhofer Lab Fit-Out - General Bids
Results
Less than $500,000 est. value
Lowell, MA 01854

Barnes and Noble Store #300
New Construction
Construction
Less than $6,215,946 est. value
Cambridge, MA 02138

MIT School of Architecture and Planning
Renovation - 217,000 SF
Pending Verification
Cambridge, MA 02139

MIT Schwarzman College of Computing
New Construction - 174,000 SF
Pending Verification
Cambridge, MA 02139

Costello Renovation Film Room Seating
Renovation
Post-Bid
Lowell, MA

Dental Clinic and Assisting Lab Phase II Renovation - General Bids
Renovation
Results
Less than $438,093 est. value
Lowell, MA

Crocker Hall Interior Renovations Phase 2 - General Bids
Renovation
Results
Less than $880,000 est. value
Framingham, MA 01701

Crocker Hall Interior Renovations Phase 2 - Filed Sub Bids
Renovation
Results
Less than $880,000 est. value
Framingham, MA 01701

Last Updated 12/25/2019 11:30 PM
Project Title

Biotechnology Facility, Talbot Building - General Bids

Physical Address View project details and contacts
City, State (County) Bedford, MA 01730   (Middlesex County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,894,503
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Work includes modifications to the existing 1st floor entryway and lobby and renovations and interior fit out to the 5th floor for the new Biotechnoloty Program. This included demolition, architectural, interiors, structural, and MEP/FP/FA reconfigurations of existing classrooms/offices to support the new teaching laboratory, classrooms, support spaces and equipment. The 1st floor work is approximately 400 SF and the 5th floor work is approximately 6,500 SF.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents