Similar Projects
HVAC Commissioning for Radon and Building Air Flow
Renovation
Sub-Bidding
$1,900,000 CJ est. value
Sandy, UT 84070

Driver License Call Center Hvac Automation Upgrade Department of Public Safety Taylorsville, Utah
Renovation
Sub-Bidding
$119,789 CJ est. value
Taylorsville, UT 84129

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Post-Bid
Salt Lake City, UT

Salt Lake City ATCT CRAC Unit Optimization
Term Contract
Results
$100,000 to $300,000 est. value
Salt Lake City, UT 84116

Rooftop HVAC Units
Alteration
Results
Riverton, UT

Airport Operations Center HVAC
Alteration
Post-Bid
Salt Lake City, UT 84122

SLCo CGC IT Cooling Tower Replacement
Alteration
Results
$90,000 to $100,000 est. value
Salt Lake City, UT 84114

University Of Utah Generator And Switches
Term Contract
Post-Bid
Salt Lake City, UT 84112

Kitchen Vent Hood Cleaning
Term Contract
Results
Herriman, Riverton, UT 84096

BEH S 025 AHU 1 System Upgrade
Alteration
Post-Bid
$190,217 est. value
Salt Lake City, UT 84112

Channing Hall Rooftop Unit Replacement
Alteration
Results
Draper, UT 84020

Install Rooftop HVAC Units
Alteration
Post-Bid
Riverton, UT

ASB HVAC Improvements
Alteration
Results
$114,655 est. value
Salt Lake City, UT 84112

4200 Pump Station Air Conditioning
Alteration
Post-Bid
Riverton, UT 84096

Last Updated 03/15/2023 02:07 AM
Project Title

Slcc Miller Campus Matc and Mcpc Boiler Upgrade

Physical Address View project details and contacts
City, State (County) Sandy, UT 84070   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $138,456 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SLCC MCPC & MATC Boiler Replacement AT Miller Campus MCPC and MATC buildings 9750 S 300 W Sandy, UT 84070 Each prerequisite and question has additional information that can be viewed by logging into U3P and clicking on the corresponding link. Bidders are prohibited from communications regarding this IFB with SLCC staff, evaluation committee members, or other associated individuals EXCEPT for the procurement officer overseeing this IFB and other SLCC Purchasing Services staff. Project Description: Replace the Boilers and Pumps in both the MATC and the MCPC Buildings on the Miller Campus per drawings and specs. Additive Alternates: None SLCC Project Manager: Nuffy Houtz Design Firm: WHW Notes/Additional Information: Construction Cost Estimate: $145,000 Completion Time: 45 days Liquidated Damages: $200.00 Tax Exempt: Yes

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents