Similar Projects
Guardian Self Storage
New Construction - 119,300 SF
Conception
$8,000,000 to $10,000,000 est. value
Fort Collins, CO 80525

Sanders Business Park at Castle Rock
New Construction
Conception
Castle Rock, CO 80104

CNG Fueling Station Storage and Office Building
New Construction - 6,100 SF
Design
$350,000 to $450,000 est. value
Fort Lupton, CO 80621

The Business Center at CTC
New Construction - 83,615 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Louisville, CO

Central Maintenance Facility
Renovation
Bidding
Aurora, CO 80018

Public Works Facility 1B Project
New Construction - 4,000 SF
Bidding
Basalt, CO 81621

New Retail Building
New Construction - 8,101 SF
Post-Bid
Thornton, CO 80023

Westcliffe Sand Shed Repairs
Post-Bid
Rosita, CO 81252

Transit Campus Expansion Bus Storage Construction
New Construction - 71,218 SF
Results
$7,000,000 to $13,000,000 est. value
Colorado Springs, CO 80903

Sand Shed Emergency Repair
Results
$150,000 to $200,000 est. value
Colorado Springs, CO 80903

U-Haul Valley Hi
New Construction, Renovation - 85,000 SF
Construction
$7,324,770 est. value
Colorado Springs, CO 80910

Advantage Storage
New Construction - 13,100 SF
Construction
Arvada, CO 80007

Noco RV Rentals
New Construction
Pending Verification
$2,000,000 est. value
Fort Collins, CO 80524

U-Haul
New Construction - 8,245 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Colorado Springs, CO 80919

Auto Trends
Addition - 4,750 SF
Conception
Fort Collins, CO 80524

Last Updated 12/16/2021 03:49 AM
Project Title

Monument Plowport and Wash Bay

Physical Address View project details and contacts
City, State (County) Monument, CO   (El Paso County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified General Contractors are invited to bid on the construction of a 1-bay Pre-engineered metal building (PEMB) building addition and wash bay remodel at an existing 8-bay Vehicle Storage Facility (VSF) in Monument, CO. The building addition will be a 1,500 square foot unheated ‘plowport’ vehicle storage structure. It will be open on one end and will have new walls and a new roof abutting the existing building. The wash bay remodel will convert two existing vehicle storage bays into wash bays, adding wash bay curtains, a pressure washer and electrical upgrades. The rest of the existing building shall remain and is not part of this project.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents