Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Port Washington Harbor Breakwater Repairs
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Port Washington, WI

Pike River Streambank Restoration Project Phase III Construction Management
Infrastructure
Bidding
Kenosha, WI

Site Utility Distribution System Replacement - Phase II MEP
Infrastructure
Bidding
$2,000,000 est. value
Menomonie, WI 54751

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Site Utility Distribution System Replacement - Phase II GPC
Infrastructure
Bidding
$2,000,000 est. value
Menomonie, WI 54751

Concrete Culverts
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Culverts
Term Contract, Infrastructure
Bidding
WI

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Concrete Culverts
Term Contract, Infrastructure
Bidding
WI

Last Updated 01/18/2022 09:10 AM
Project Title

Manitowish - Hurley, CTH C - Iron Street

Physical Address View project details and contacts
City, State (County) Manitowish, WI   (Iron County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 2,775 CY; Base Aggregate Dense, 4,620 Ton; Base Aggregate Open Graded, 9 Ton; Marking Epoxy, 74,664 LF; Construction Staking, 21,285 LF; Construction Staking, 6 Each; Construction Staking, 1 LS; Culvert Pipe, 228 LF 24”, 256 LF 30“; Asphaltic Surface, 730 Ton; HMA Pavement, 6,277 Ton; Removing Asphaltic Surface Milling, 74,140 SY; Tack Coat, 5,557 Gals

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents