Similar Projects
Fuel Farm Improvements Project
Infrastructure
Bidding
Elizabeth City, NC

Expansion of the Municipal Gas System
Infrastructure
Bidding
Wilson, NC

Replace Natural Gas Piping (House Piping)
Post-Bid
Weldon, NC 27890

Demolition Services for Harnett County Public Building/Facilities Management
Demolition
Post-Bid
Olivia, NC 27332

Gas Leak Detection and Atmospheric Corrosion Survey Services
Term Contract
Results
Greenville, NC 27834

Boat Refueling System Repairs for the U.S. Coast Guard (USCG) Station Hatteras Inlet
Results
Hatteras, NC 27943

WTP Fluoride Feed System Improvements
Infrastructure
Bidding
Newton, NC

Former Police HQ Building - Underground Storage Tank Closure
Post-Bid
Raleigh, NC 27601

SHP High Point UST Removal
Results
Less than $20,000 est. value
High Point, NC 27263

Petroleum Tank Installation, Operations and Maintenance Services
Term Contract
Post-Bid
Charlotte, NC 28206

Natural Gas System Expansion
Results
Lexington, NC

Fuel Storage Tanks
Term Contract
Post-Bid
Raleigh, NC 27699

LCGC Generator Day Tank Replacement
Results
Sanford, NC 27330

Liquefied Petroleum Gas & Tank Monitoring Services
Post-Bid
Jacksonville, NC 28542

Natural Gas Distribution Construction Services
Results
Greenville, NC 27834

Last Updated 06/02/2021 04:44 PM
Project Title

Diesel Fuel Ast Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing 10,000-gallon Diesel Fuel Above Ground Storage Tank (AST) system including the submerged turbine pump (STP), valves, piping, probes, sensors, platform, and ladders. Contractor shall take possession of the tank, platform, ladders, STP, and appurtenances upon removal from their currently installed locations and all other items as shown on the Contract Drawings. PWC will contract with an Environmental Contractor for the removal of fuel and/or water from the tank, cleaning and preparation for removal by the Contractor. Upon removal of the existing tank the Contractor shall install a new 20,000- gallon Diesel Fuel AST with walkway, ladders, saddles, and new concrete piers as shown on the Contract Drawings and per the specifications shown on the Contract Drawings. There are two bid alternates shown on sheet C.2.1. Bid Alternate 1 shall be to replace the Diesel Off Load Pump. Bid Alternate 2 shall be to replace the Gasoline Off Load Pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents