Similar Projects
Abatement and Demolition of Kenamond Hall and Turner Hall
Bidding
Shepherdstown, WV

Asbestos Abatement Services
Term Contract, Alteration
Bidding

Environmental Compliance & Conservation Services (ECCS MAIDIQ)
Post-Bid

Environmental Compliance & Conservation Services (ECCS MAIDIQ)
Post-Bid

Demolition and Asbestos Removal 2 Structures
Infrastructure, Alteration
Bidding
Weirton, WV 26062

Range Ecosystem Maintenance and Wildlife Enhancement Work
Post-Bid
$25,000 to $75,000 est. value
Marlinton, Parsons, Petersburg, White Sulphur Springs, WV

H999--Sources Sought for Comprehensive Water Testing and Monitoring Program Beckley WV VAMC
Term Contract
Bidding
Beckley, WV 25801

Clendenin Elementary Abatement
Post-Bid
Clendenin, WV 25045

Asbestos Building Inspections and Testing
Post-Bid
Charleston, WV

Inspection, Asbestos Abatement and Demolition
Post-Bid
Oak Hill, WV

Last Updated 05/13/2021 12:26 PM
Project Title

HSC Ground Floor Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Morgantown, WV   (Monongalia County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximate 2,720gsf of space, located in HSC North Building, 2nd floor. Once renovated, the space will accommodate 2,136sf - classlab and an additional 408sf - Storage room. Construction Highlights include and limited to: Project Boundary: Rooms included - 2052, 2062, 2063, 2064 & 2064A. Rooms Excluded - 2050. Demolition: Removal of 1,107sf of interior wall, 1964sf of suspended and plaster ceiling 2,610sf of flooring. 179 linear feet of casework and a 710sf Thermax refrigeration unit. 7 electrical panels/box, 14 electrical & data outlets and 69 light fixtures. Construction: Lamination of 1,472sf & creation of 414sf of interior wall, installation of 5 doors. Installation of 2,720sf of both suspended ceiling & vct flooring and 288 linear feet of covebase per WVU HSC Standards. Fire Protection: Updating Fire Prevention and Signaling devices to code per McHenry Assoc. recommendations. HVAC: Updating HVAC systems per McHenry Assoc. recommendations. Electrical & Date: Install 1 distribution panel, 49 Electrical, 18 data and 57 LED light fixtures to be added. Additional IT Switch to be incorporated into local telecommunications closet. FFE: Finishes are to reflect HSC Standards. 62 linear feet of repurposed casework w/new epoxy countertops. 40 workstations, 50 lab stools and 3 additional biosafety cabinets. 2-80" monitors, 4-96" white boards and 1 advanced technology instructor's station. HSC administration is responsible for room signage and floor/area wayfinding.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents