Similar Projects
Howard Avenue Drainage Improvements – Phase II
Bidding
Dade City, FL 33525

East Avenue Drainage Project
Bidding
Brooksville, FL 34601

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Pinellas Trail and 54th Avenue North Drainage Improvements (Pid # 000183A)
Results
$2,479,385 est. value
FL

Install Seawall Cap on Existing Seawall
Results
$70,000 est. value
New Port Richey, FL 34568

Sidewalk/Drainage Improvements
Bidding
$1,993,000 est. value
FL

Channel 1 Concrete Panel Replacement West of 66th Street
Post-Bid
Pinellas Park, FL 33781

Drainage Improvements for Third, Fourth, Fifth and Sixth Street BMP 3 and 4
Results
$328,559 est. value
Belleair Beach, FL 33786

Channel 5 Rip Rap Repairs Project
Post-Bid
Less than $100,000 est. value
Pinellas Park, FL 33781

Palm Avenue Drainage Improvements
Results
Less than $580,000 est. value
Tarpon Springs, FL 34688

2020 Seawall Repair - Jasminpark
Post-Bid
$360,000 est. value
New Port Richey, FL 34652

FY19 City-Wide Stormwater Box Culvert Rehabilitation
Results
Less than $1,000,000 est. value
Tampa, FL 33600

Creek Shoreline Restoration
Post-Bid
Less than $600,000 est. value
Saint Petersburg, FL 33711

Drainage Improvement
Results
Less than $1,299,000 est. value
FL

Last Updated 04/29/2020 07:32 AM
Project Title

Stormwater Pond Maintenance

Physical Address View project details and contacts
City, State (County) (Citrus, Hernando, Hillsborough, Pasco, Pinellas Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide stormwater pond maintenance at US 41B (20th Street) and Corrine Street (See project location maps attached). Maintenance involves removal and proper disposal of sediments and nuisance vegetation as described below. Original plan sheets are attached to provide details of the project area designated as "Ditch Water Quality Mitigation Area" including proposed grades to be achieved upon final excavation of sediment.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents