Similar Projects
Performing Arts Annex, Gymnasium & Athletic Turf Field
New Construction
Conception
$30,000,000 est. value
Chicago, IL 60618

University of Chicago Wexford Tower
New Construction
Design
Chicago, IL

Dining Area Upgrades Prairie State College Project
Renovation
Bidding
Chicago, IL

Renovate Classroom 250 at Science and Engineering South - Bid Package - Division 01
Renovation
Post-Bid
Chicago, IL 60607

Des Plaines Cafeteria
Renovation
Post-Bid
Des Plaines, IL 60016

Waterproofing
Renovation
Results
Palatine, IL 60067

Restroom Renovations Phase 3
Renovation
Results
Chicago Heights, IL 60411

Harper College University Center Building
Pending Verification
$83,000,000 est. value
Palatine, IL 60067

Renovate Classroom 250 at Science And Engineering South - Bid Package - Division 05
Renovation
Post-Bid
Chicago, IL 60607

Building M Hall of Fame
Results
Palatine, IL 60067

5th Floor Auditorium - CMET
Post-Bid
Chicago, IL 60612

Third Floor Renovations - Building E
Renovation
Results
River Grove, IL 60171

Building P Police Locker Rooms
Renovation - 750 SF
Post-Bid
Palos Hills, IL 60465

Center for Multicultural Learning
Renovation, Demolition - 2,000 SF
Results
Palatine, IL 60067

Building A Culinary Center at Harper College
Renovation
Post-Bid
Palatine, IL

Last Updated 05/18/2021 01:30 PM
Project Title

UIC MRI 2 Replacement - OCC

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Separate Bid Packages 01-General Work & Plumbing 03-Heating & Ventilation Replacement of an existing MRI with a new machine (provided under separate contract) to meet the evolving mission of the clinic. The equipment replacement and upgrade are accompanied by a general renovation of the MRI room including new millwork and finishes, a revised ceiling plane, and construction of a penetration panel enclosure and cable management components within the room. Structural support and roof modifications are required to accept a vendor-furnished MRI chiller. Additional structural considerations will be required in the loading dock to accommodate the weight of the MRIs.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents