Similar Projects
Dell Range/Rue Terre Intersection - EN-14-008 - City of Cheyenne
Infrastructure
Conception
$4,000,000 CJ est. value
Cheyenne, WY 82009

Dell Range/Rue Terre Intersection - EN-14-008 - City of Cheyenne
Infrastructure
Conception
$4,000,000 CJ est. value
Cheyenne, WY 82009

RFP D/B - Repair Base Perimeter Fence
Infrastructure
Design
$500,000 CJ est. value
Cheyenne, WY 82001

North City Improvements - North City Tank
Infrastructure
Bidding
$2,500,000 CJ est. value
Cheyenne, WY 82001

Sanitation Division Transfer Station Welding Repairs
Infrastructure
Bidding
$100,000 CJ est. value
Cheyenne, WY 82007

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Cheyenne Streets - Warren Ave (Lincolnway - 24th)
Infrastructure
Results
Cheyenne, WY

District 1 Crack Seal
Infrastructure
Results

Storey Boulevard and Ridge Road Signalized Intersection
Infrastructure
Construction
$480,000 CJ est. value
Cheyenne, WY 82001

Hyatt Place Hotel and Cheyenne Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$55,000,000 CJ est. value
Cheyenne, WY 82007

Hyatt Place Hotel and Cheyenne Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$55,000,000 CJ est. value
Cheyenne, WY 82007

RFQ Engineering - Professional Engineer Services for Phase 1 Environmental Site Assessments
Infrastructure
Conception
$300,000 CJ est. value
Cheyenne, WY 82001

2023 City Overlay #2
Infrastructure
Bidding
$800,000 CJ est. value
Cheyenne, WY 82001

Pine Bluffs Reher Park Playground
Renovation, Alteration
Post-Bid
Pine Bluffs, WY 82082

Last Updated 01/30/2023 12:33 AM
Project Title

Belvoir Ranch/Big Hole Master Plan - PL-14-003 - City of Cheyenne

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,175,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 2008 Belvoir Ranch Master Plan called for a five-year plan to allow public access to the Belvoir for recreation, including trails, parking, vault toilet restrooms, a campground, and gravel roads. Over the last 11 years various elements of the ranch have changed including the introduction of wind energy, acquisition of new land, disposal of nearby land, and identification of funding resources for implementation. This project is for planning and design and implementation for a first phase of the Belvoir Ranch/Big Hole Project. Phase I may include vehicle access road improvements, a trailhead, and some multi-purpose, non-motorized trails. As of January 30, 2023, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents