Similar Projects
Tamiami Trail Parking - North - R19TTP - City of North Port
Infrastructure
Conception
$1,200,000 CJ est. value
Port Charlotte, FL 33954

Tamiami Trail Parking - South - R16TTP - City of North Port
Infrastructure
Conception
$1,130,000 CJ est. value
Port Charlotte, FL 33954

Home2 Suites / Punta Gorda
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Punta Gorda, FL 33950

Heritage Lake Park Subdivision
New Construction, Infrastructure
Design
$15,652,160 CJ est. value
Punta Gorda, FL 33983

CONS-HENRYSTFM/1620 - Force Main and Gravity Sewer Reconstruction
Infrastructure
Bidding
$1,334,743 CJ est. value
Punta Gorda, FL 33950

Manhole Replacement
Infrastructure
Bidding
$119,025 CJ est. value
Port Charlotte, FL 33952

ABC Fine Wine & Spirits #144T / Port Charlotte
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Port Charlotte, FL 33952

Charlotte Storage Facility
New Construction, Infrastructure - 27,530 SF
Post-Bid
$3,000,000 CJ est. value
Port Charlotte, FL 33980

Lister Park Seawall Replacement
Infrastructure
Results
$232,575 CJ est. value
Port Charlotte, FL 33952

2.0 Mg Ground Tank Repair
Alteration
Results
$64,000 est. value
Punta Gorda, FL 33982

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Sandhill Boulevard Phase I
Infrastructure
Construction
$1,602,681 CJ est. value
Punta Gorda, FL 33983

Harpoon Harry's & Shops at Bayshore
New Construction, Infrastructure - 62,060 SF
Pending Verification
$18,000,000 CJ est. value
Port Charlotte, FL 33980

Cove at West Port Phase 4
New Construction, Infrastructure
Pending Verification
$58,000,000 CJ est. value
Port Charlotte, FL 33954

Melbourne Street Waterfront Building and Restaurant
New Construction, Infrastructure - 54,000 SF
Conception
$8,000,000 CJ est. value
Port Charlotte, FL 33980

Last Updated 10/06/2023 08:39 AM
Project Title

Elevated Storage Tank Replacement Project

Physical Address View project details and contacts
City, State (County) Punta Gorda, FL 33950   (Charlotte County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $580,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 6,2023, this project has not yet been awarded. A timeline for award has not yet been established. The project will replace the existing 100,000-gallon elevated storage tank (EST) with the installation of a new 500,000-gallon ground storage tank (GST) equipped with a booster pump station (BST) to meet the rising demands and pressure requirements of the CHWA service area. The pump building will be equipped with variable frequency driven (VFD) pumps and a backup diesel generator with automatic transfer switch (ATS) for emergency use. Improvements for this project include but are not limited to the following; installing a hypochlorite/ammonia sulfate disinfection system, constructing a stormwater treatment area to retain the additional runoff discharge, implementing landscaping buffers and preserving natural vegetation in the area to minimalize impervious area of the proposed site, elevating essential facilities to remain operational in the event of extreme loading from flooding. Project Work will also include the demolition of the existing Elevated Storage Tank once the GST and BST have reached substantial completion. The project shall include the construction of a 10" WM extending from project site to Melbourne Street to Shady Lane and 6" WM extending from Existing EST to Homewood Street.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents