Similar Projects
Viridian
New Construction
Conception
Tuscaloosa, AL

Outdated Fire Station Replacement
Renovation
Conception
Mountain Brook, AL 35223

Fire Station 5
New Construction - 11,000 SF
Design
Orange Beach, AL 36561

Fire & Rescue Station 20 - City of Huntsville
New Construction
Design
$3,000,000 est. value
Madison, AL 35756

2018 PAYGO- North McGregor Avenue Reconstruction
Infrastructure
Bidding
$5,533,257 CJ est. value
Mobile, AL 36608

New Justice Center
New Construction, Infrastructure
Bidding
$5,500,000 CJ est. value
Bay Minette, AL 36507

Regrade Runway Safety Area and Hight Intensity Runway Lighting Replacement for Runway 12-30
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Muscle Shoals, AL 35661

2022 City Park Lighting Improvements
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Pelham, AL 35124

Geneva County Jail Site Improvements
Post-Bid
Geneva, AL 36340

Final Grading for the Evergreen Inert Landfill Closure
Post-Bid
Evergreen, AL

New Benjamin Russel High School Package A - Sitework
Results
Alexander City, AL 35010

Modernization of Public Housing Site AL117-1A and AL117-1B Roofing
Results
$24,800 est. value
Chatom, AL

Public Safety Training Facility
New Construction - 35,000 SF
Construction
Less than $6,500,000 est. value
Huntsville, AL 35805

Alabaster Police Department Building Package
New Construction - 32,000 SF
Construction
Less than $11,772,000 est. value
Alabaster, AL 35007

Chapel Heights
New Construction, Infrastructure
Pending Verification
Auburn, AL

Last Updated 07/26/2022 11:36 AM
Project Title

Fire Station #10 Construction - City of Dothan

Physical Address View project details and contacts
City, State (County) Dothan, AL 36301   (Houston County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of July 26, 2022, this project is currently in the FY 2022-2026 CIP. An architect has been selected for the project. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents