Similar Projects
SoHi Apartments
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Salt Lake City, UT 84101

DFCM Construction UU Applied Sciences Building
New Construction
Design
$62,399,123 est. value
Salt Lake City, UT 84112

Electrical and Communications Duct Bank from AOC to Gate 7
Infrastructure
Bidding
$300,000 CJ est. value
Salt Lake City, UT 84116

RFQ D/B - UTA Design Team for Headquarters Redevelopment
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Salt Lake City, UT 84101

Remodel - Williams Building Critical Network Remodel
Renovation
Post-Bid
$1,458,218 est. value
Salt Lake City, UT 84108

Grasmere Park Site Improvement Project
Infrastructure
Post-Bid
West Valley City, UT 84119

Miscellaneous Office and Conference Room Remodels at Granite Education Center
Renovation
Results
Salt Lake City, South Salt Lake, UT 84115

Delong Street And Parks and Public Lands Storage Yard Improvements
Results
Salt Lake City, UT

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

HEDCO Renovation and Upgrade Room 130
Renovation
Construction
Salt Lake City, UT 84112

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Bueno Avenue Apartments
New Construction, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

RFQ Construction Manager - Division of Facilities Construction and Management (DFCM) Construction- University of Utah Health Sciences Campus Office Building
New Construction, Infrastructure
Bidding
$78,439,728 CJ est. value
Salt Lake City, UT 84132

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

Last Updated 11/01/2022 12:06 PM
Project Title

RFP Construction Manager - University of Utah - Interdisciplinary Computing Building

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84112   (Salt Lake County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $2,793,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Construction Management/General Contractor (CM/GC) project includes: Construction of the new Interdisciplinary Computing Building at the University of Utah, housing the School of Computing and Health Informatics. This high-priority project is a response to the strong demand for tech jobs in Utah and the enrollment growth in higher education computing. The "Base Building" is 209,000 square feet. Preconstruction will be required to address both the "Base Building" as well as "Additional Space Considerations", including a Department of Defense Data Center (SCIF), a shelled building floor for additional growth, and underground parking. The Contractor for the project must be a Utah licensed General Contractor. Association with other individuals or firms having appropriate professional expertise is acceptable. The State will enter into a single agreement with the successful Contractor. A bid bond in the amount of 5% of the Fixed Contract Price Limit, made payable to the Division of Facilities Construction and Management on an AIA Document A310 - 2010 Bid Bond form, or equivalent, shall accompany the Contractor's Cost Proposal. The Division of Facilities Construction and Management reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the State. Short Listing by Selection Committee (if needed) Friday, September 16, 2022 TBD TO BE DETERMINED Announcement of Finalists Monday, September 19, 2022 4:00 PM U3P website Interviews (if needed) Wednesday, September 28, 2022 TBD TO BE DETERMINED Announcement Friday, September 30, 2022 4:00 PM U3P website Target “Base Building” Substantial Completion Date Friday, July 18, 2025

Details

209,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents