Similar Projects
Tupelo North
New Construction, Infrastructure
Conception
$80,999,928 CJ est. value
Mebane, NC 27302

Wyndham Hotel Garden and Hawthorne Suites
New Construction, Infrastructure - 5,000 SF
Design
$40,000,000 CJ est. value
Mebane, NC 27302

AutoZone #5610 / Burlington
New Construction, Infrastructure - 7,374 SF
Bidding
$1,500,000 CJ est. value
Burlington, NC 27215

Resurfacing and Shoulder Reconstruction
Infrastructure
Bidding
$2,000,000 CJ est. value
Burlington, NC 27215

Duke Health Mebane Medical Office Building
New Construction, Infrastructure - 58,764 SF
Post-Bid
$10,000,000 CJ est. value
Mebane, NC 27302

Strickland Brothers 10 Minute Oil Change / Mebane
New Construction, Infrastructure - 1,621 SF
Post-Bid
$1,200,000 CJ est. value
Mebane, NC 27302

Smith Hall
Renovation - 2,730 SF
Construction
Elon, NC 27244

Elon University - Carolina Hall Renovations
Renovation - 2,983 SF
Construction
Elon, NC 27244

Maple Avenue Corridor Plan
Infrastructure
Pending Verification
$47,000,000 CJ est. value
Burlington, NC 27215

North Mebane Village
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Mebane, NC 27302

RFQ D/B - Entertainment Venue at the Burlington Athletic Stadium
New Construction, Infrastructure
Post-Bid
$1,950,000 CJ est. value
Burlington, NC 27217

Project Skywalker
New Construction, Infrastructure - 900,000 SF
Pending Verification
$483,000,000 CJ est. value
Mebane, NC 27302

Alamance Community College Bill & Nancy Covington Education Center
New Construction, Infrastructure
Post-Bid
$380,000 CJ est. value
Mebane, NC 27302

Parc Northwest
New Construction, Infrastructure - 100,000 SF
Pending Verification
$179,000,000 CJ est. value
Elon, NC 27244

Family Dollar #20787 / Graham
New Construction, Infrastructure - 10,537 SF
Post-Bid
$400,000 CJ est. value
Graham, NC 27253

Last Updated 11/10/2022 09:04 AM
Project Title

East Neighborhood Commons

Physical Address View project details and contacts
City, State (County) Elon, NC 27244   (Alamance County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Dormitory, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new 3 story residence hall with 52 units, flex space, student lounges and an office. As of November 10, 2022, this project is in the early planning stages and has received approval from the Elon Planning Board. An architect has been selected. Information regarding a general contractor has not been provided. Construction is expected to break ground June 1, 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents