Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Oakland WWTP Sludge Thickening - 291091.00 0 - City of Topeka
Renovation
Conception
$3,598,000 est. value
Topeka, KS 66612

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Wastewater Treatment Plant Solids Treatment Upgrade and Expansion Project
Addition, Demolition, Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Manhattan, KS 66502

RFP D/B - Federal Correctional Institute (FCI) - City of Leavenworth
New Construction, Infrastructure
Bidding
$300,000,000 CJ est. value
Leavenworth, KS 66048

Booster Pump Station Improvements
Renovation, Infrastructure
Bidding
$430,000 CJ est. value
Manhattan, KS 66502

The Hudson - Apartments and Parking Garage
New Construction, Infrastructure - 664,000 SF
Sub-Bidding
$50,000,000 CJ est. value
Kansas City, KS 66103

Lighting
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Lacey, KS 67701

FOLS - Construct two ABA compliant walkways
Infrastructure
Post-Bid
$100,000 CJ est. value
Larned, KS 67550

Turner`S Logistic Center West
New Construction
Post-Bid
Kansas City, KS

Boring Marsh of The Swans Water Supply Line
Term Contract
Results
Melvern, KS 66510

Farmers' Market Pavilion Site
Infrastructure
Results
Overland Park, KS

City of Wichita Northwest Water Facility (NWWF)
Addition
Construction
$20,000,000 CJ est. value
Wichita, KS 67203

The Highlands of Deer Creek
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Overland Park, KS 66213

Johnson County Wastewater Pump Station - City of Leawood
New Construction, Infrastructure
Pending Verification
$1,290,000 CJ est. value
Leawood, KS 66206

Last Updated 08/11/2022 01:07 PM
Project Title

Clay Center Wastewater Addition Project

Physical Address View project details and contacts
City, State (County) Clay Center, KS 67432   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $79,644 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Clay Center is requesting bids for an addition to the Wastewater building. All interested bidders shall submit a sealed bid to the City of Clay Center City Clerk prominently marked Clay Center Wastewater Addition Project . Questions should be directed to Kerry Rozman for scope of work at 785-632-5454 or email cityclerk@claycenterks.com. The city reserves all rights to reject any and all bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents