Similar Projects
Last Updated | 03/09/2023 08:33 AM |
Project Title | Park Plaza Public Space - Phase One |
Physical Address | View project details and contacts |
City, State (County) | Lansing, IL 60438 (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $692,267 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Lan-Oak Park District does hereby invite sealed bids for the Park Plaza Public Space - Phase One project. Work will include site preparation, construction fencing, temporary soil erosion and sediment control measures, site removals and clearing, earthwork, excavation and grading, cast-in-place concrete, shelter installation, concrete paving and bands, unit paving, underground electrical & stormwater utilities, site furnishings installation, landscape planting, native seeding, and turf seeding. All bidders will be required to submit Bid Security in the form of a Bid Bond, Certified Check, Cashiers Check in the amount of 10% of the Base Bid, payable to Lan-Oak Park District. The successful bidder, as determined by the Lan-Oak Park District, shall be required to pay, and to agree to pay no less than the Prevailing Rate of Wages, pursuant to the Illinois Prevailing Wage Act (820 ILCS 130) for the locality of the Lan-Oak Park District Cook County, to each laborer worker, or mechanic needed or used to complete the work as detailed in the contract to be let. The successful contractor, and all subcontractors shall be required to submit, to the Lan-Oak Park District, certified payrolls (or a letter in lieu thereof certifying that no certified payroll is required under the terms of the Act) with every application for payment. The Lan-Oak Park District reserves the right to reject any and all proposals, parts of any and all proposals, or to waive technical errors or omissions in submitted proposals. No submitted bid may be withdrawn until a period of sixty (60) days after the bid opening date, without written consent of the Lan-Oak Park District. The Lan-Oak Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. Questions should be directed in writing to Doug Fair, Hitchcock Design Group at: dfair@hitchcockdesigngroup.com |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |