Similar Projects
West End Regional Pond & Trunk Oversizing - CIP - STORM-18-007 - City Of Shakopee
Infrastructure
Conception
$400,000 CJ est. value
Shakopee, MN 55379

Fish Creek Open Space - PM16.005 - City of Maplewood
Infrastructure
Conception
$300,000 CJ est. value
Maplewood, MN 55119

Snow Removal
Term Contract
Design
Hutchinson, MN 55350

Tree Removal & Disposal and Stump Grinding & Disposal
Term Contract
Sub-Bidding
Minneapolis, MN 55415

Property Demolition and Clean-up
Demolition, Infrastructure
Sub-Bidding
$80,000 CJ est. value
Saint Cloud, MN 56303

Asbestos Removal at Brimhall Elementary School
Infrastructure
Post-Bid
Roseville, MN 55113

John Marshall - Phase 2 Asbestos Removal
Alteration
Post-Bid
Rochester, MN 55901

Long Lake Sediment Basin Dredging
Infrastructure
Results
$1,147,615 CJ est. value
New Brighton, MN 55112

Library Mechanical Rooms Asbestos Abatement
Alteration
Results
$80,000 est. value
Bloomington, MN 55431

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Selective Demolition and Temporary
Renovation - 20,000 SF
Construction
$78,500 CJ est. value
Saint Paul, MN 55116

Removal/Demolition of Multiple Buddings & Site Amenities
Demolition, Infrastructure
Construction
$36,100 CJ est. value
Bemidji, MN 56601

Green Valley Greenhouse Expansion
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Ramsey, MN 55303

Downs Lake - Sunfish Ponds - Forest Utility Improvement - W-040 - City of Lake Elmo
Infrastructure
Conception
$1,705,000 CJ est. value
Lake Elmo, MN 55042

Twin Cities Habitat for Humanity Radon Mitigation
Alteration
Post-Bid
Minneapolis, MN 55427

Asbestos Abatement for MPHA Family Housing Expansion
Alteration
Results
$40,000 est. value
Minneapolis, MN

Last Updated 06/28/2023 09:28 AM
Project Title

2023 Hill Tower Demolition Project

Physical Address View project details and contacts
City, State (County) Chaska, MN 55318   (Carver County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $504,180 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition Project In general and pursuant to Minnesota Statutes, chapter 429, the work consists of the demolition of an existing above ground concrete water storage tank and the construction of a pressure reducing station along with associated water main pipe. . 250 LF of 8" PVC Water main, directionally drilled . 300 LF of 6" and 8" PVC Water main, open cut . 1 EA Pressure reducing station . 1 LS Demolition of existing 300,000 gallon concrete ground storage tank . 1 LS Demolition of existing concrete block storage building . 4 EA 1" and 1.5" water services . 155 TN Bituminous Course Mixtures . 100 LF Concrete Curb and Gutter Along clearing and grubbing, restoration and correlated appurtenances. No pre-bid conference for the project will be held. Direct inquiries to Engineer's Project Manager, Nate Drews, at (612) 712-2035 and nate.drews@stantec.com Instructions for viewing the bid opening will be made available through Electronically and posted on the City's website. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. For this project, the City will only accept online electronic bids through Electronically . To access the electronic bid, download the project documents and click on the online bidding button at the top of the advertisement. Prospective bidders must be on the plan holders list through Electronically for bids to be accepted. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 30 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents