Similar Projects
New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2022 Summer Work
Renovation
Bidding
Wheeling, IL

2022 Renovations
Renovation
Bidding
Rosemont, IL

North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

CM at Risk - Partial High School Replacement and Junior High School/High School Renovation
Renovation
Results
Toulon, IL 61483

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

Indoor Air Quality Improvements - Bid Release 2
Renovation
Bidding
Joliet, IL 60432

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Cloverdale ES New Innovative Center
Renovation
Results
Carol Stream, IL 60188

Construction Management at Risk Services for AIS Capital Improvement
Renovation
Bidding
Chicago, IL

2021 Pavement and Playground Renovations
Renovation
Post-Bid
McHenry, IL 60050

Argo G Bldg Second Floor Toilet Renovation
Renovation
Results
Summit, IL 60501

East Aurora High School Tunnel Repairs
Renovation
Bidding
Aurora, IL 60505

2021 Summer Work
Renovation, Addition
Post-Bid
Winnetka, IL 60093

Last Updated 02/23/2022 05:47 PM
Project Title

Marion High School Miscellaneous Accessibility Improvements - Phase 5

Physical Address View project details and contacts
City, State (County) Marion, IL 62959   (Williamson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to include the removal of existing site asphalt and concrete work. New Work to include the installation of new ADA compliant concrete sidewalks, viewing areas, and the regrading of portion of the existing site as described in the construction documents. Alternate Bid #1 Work to include the removal of the existing wood mulch and perimeter edging around the existing playground. New Work to include the installation of new underground playground drainage, ADA compliant concrete sidewalk to access the playground, concrete perimeter wall with guardrail, ADA compliant poured-in-place play surfacing, ADA compliant parking signage and striping as well as all other items.

Details

Middle/Senior High School, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents