Similar Projects
Miles Pond Dam Improvements
Results
$120,000 est. value
Concord, VT 05824

Crystal Lake Dam Improvements
Results
Barton, VT

Maintenance of Seepage Control System, Waterbury Dam
Term Contract
Results
$196,885 est. value
Waterbury, VT

Laplatte River Lamprey Barrier Project
Infrastructure
Results
Shelburne, VT 05482

Camp Wihakowi Dam Removal
Demolition
Construction
Northfield, VT

Stevens Branch Dam Removal Study and Design
New Construction, Term Contract
Post-Bid
Montpelier, VT 05602

Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Last Updated 09/23/2021 12:16 PM
Project Title

Dunklee Pond Dam Removal

Physical Address View project details and contacts
City, State (County) Rutland, VT 05701   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $224,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work tasks will generally involve removal of the remains of Dunklee Pond Dam; sediment removal and hauling offsite (11,300 CY); stream channel restoration; removal of failing retaining walls; installation of stone armor; installation of a stone weir; and site restoration (See Attachment A). Planting of 10 ball and burlap trees will be performed as part of this contract, while other plantings.

Details

Dam/Tunnel, Demolition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents