Similar Projects
US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 2 - Arizona Department of Transportation (AZDOT)
Alteration
Conception
$41,000,000 est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 est. value
Kingman, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

City-Wide Paving Project
Infrastructure
Post-Bid
Bullhead City, AZ 86442

Safety Improvements
Results
Less than $640,000 est. value
Kingman, AZ 86411

Apache Road Improvements North Phase
Results
Kingman, AZ 86413

Dilkon Road Improvement
Infrastructure
Post-Bid
$2,000,000 est. value
Golden Valley, AZ 86413

Brooks Boulevard Millings
Results
Kingman, AZ

Gary Keith Park Paving Improvements Project
Infrastructure
Post-Bid
$350,000 est. value
Bullhead City, AZ - Council, ID 83612

Shinarump Road Phase II
Results
Kingman, AZ

Kingman Industrial Park Roadway Improvements
Infrastructure
Results
Kingman, AZ

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Results
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Horsethief Basin Roads Maintenance - Prescott National Forest
Term Contract
Results
Prescott, AZ 86301

McCulloch Boulevard Pavement Rehabilation Project
Infrastructure
Results
$1,055,400 est. value
Lake Havasu City, AZ 86403

FY 2021-2022 Crack Seal Program
Infrastructure
Results
$300,000 est. value
Lake Havasu City, AZ 86403

Reported 07/08/2022 12:00 AM
Project Title

Beale Street Streetscape and Improvements project

Physical Address View project details and contacts
City, State (County) Kingman, AZ 86401   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located in the historic downtown area on Beale Street, from First Street to Sixth Street, a distance of approximately 2,700 feet. This project will include a traffic, utility, drainage, and complete street study to define roadway lane configurations, intersection improvements, traffic control devices, signage, pavement marking improvements, vertical realignment, lighting, landscaping, curb and gutter, sidewalk, drainage improvements, utility improvements, ADA improvements, and aesthetic improvements related to the City's desire to further develop the streetscape and livability of Beale Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents