Similar Projects
Modification of Ben Taub IR Suites Air Handling Unit and Associated Ductwork
Alteration
Bidding
$300,000 est. value
Houston, TX 77030

Replacement of OCB AHU`s and Chillers
Alteration
Bidding
Houston, TX 77054

Heating, Ventilation, and Air Conditioning Services
Term Contract
Post-Bid
Houston, TX 77251

ROC Rooftop Unit Replacement
Post-Bid
Houston, TX 77030

Four (4) Liebert Air Handling Units Replacement at Houston Air Traffic Control Tower (IAH ATCT)
Results
Less than $150,000 est. value
Houston, TX 77032

Duct Bank-William P. Hobby Airport
Results
Less than $100,000 est. value
Houston, TX 77061

Maintenance Supplies, Equipment and Services
Term Contract
Bidding
Waller, TX

HVAC Bundle
Post-Bid
Baytown, TX

HVAC Replacements for Coleman College
Term Contract
Results
$800,000 to $900,000 est. value
Houston, TX 77030

Lab HVAC Maintenance Repairs
Term Contract, Alteration
Bidding
Houston, TX 77023

Informal - Daikin Split Cool Units for BCT, BPT AND TBT
Post-Bid
Houston, TX

HVAC Condenser Leak Repair & Software Update
Results
Houston, TX 77034

Districtwide Indoor Air Quality Enhancement
Alteration
Bidding
Alief, TX

Bayport Facilitys First Step Blower Replacement Project
Post-Bid
Houston, TX

4110--NFS Walk-In Refrigeration
Results
Houston, TX 77030

Last Updated 04/15/2022 12:51 PM
Project Title

North Forest HVAC Replacement

Physical Address View project details and contacts
City, State (County) Houston, TX 77050   (Harris County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing units and Provide (2) BRAND NEW York XTI-60x108 or approved equal by Carrier or Trane. 1. Responsible for disassembly and removal of existing units from the job site 2. Responsible for disassembly and assembly of new units so they fit within existing doorways of the building 3. Modify existing ductwork, piping and power as needed to reconnect new units 4. Responsible for all electrical disconnects and reconnections as needed 5. Replace VSDs for both units 6. Cleanup of all materials and removal from the building and All controls must function as designed before leaving. 7. Work to be performed after-hours or on weekends.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents