Similar Projects
Highway Salt Cooperative Bid
Term Contract
Bidding
Andover, MA 01810

On-Call Contract for Marine Construction Services
Term Contract
Sub-Bidding
Gloucester, MA 01930

Preventive Maintenance & Assocciated repairs
Term Contract
Sub-Bidding
$18,000 CJ est. value
Methuen, MA 01844

Action Energy Services Weatherization Assistance Program
Alteration
Post-Bid

Tree Planting
Term Contract
Post-Bid
Salem, MA 01970

Pavement Preservation Project/Various Locations
Term Contract
Results
$550,000 CJ est. value
Arlington, MA 02476

Haskell Pond Dam Shooting Range Soil Berm Removal Project
Infrastructure
Results
$99,100 CJ est. value
Gloucester, MA 01930

Refuse, Recycling & Organics Curbside Collection Services
Term Contract
Sub-Bidding
Newburyport, MA 01950

RFP for Accounting Services
Term Contract
Post-Bid

Catch Basin Cleaning and Disposal
Term Contract
Results
$66,840 CJ est. value
Haverhill, MA 01830

Cleaning Services
Term Contract
Sub-Bidding
Danvers, MA 01923

Weatherization
Term Contract
Post-Bid
Lawrence, MA

Supply, Installation and Removal of Virgin Granular Activated Carbon at Water Treatment Plant
Renovation
Results
$186,300 CJ est. value
North Andover, MA 01845

Elevator Maintenance
Term Contract
Sub-Bidding
$90,000 CJ est. value
Danvers, MA 01923

Valves, Hydrants, and Iron Products
Term Contract
Post-Bid
$71,000 CJ est. value
Danvers, MA 01923

Last Updated 07/22/2023 08:03 AM
Project Title

ADA Shower Renovation

Physical Address View project details and contacts
City, State (County) Methuen, MA 01844   (Essex County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $24,612 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The participation goals for this project shall be 15.3% for minorities and 6.9% for women. A. The Work of the Contract consists of: 1. Remove shower, sink, toilet, floor tile and wall tile. 2. Install new tile (floors and walls) 3. Install new ADA toilet, sink and vanity, and mirror. 4. Install new 4-pice shower, folding chair and accessories. 5. Install bathroom accessories including, toilet paper dispenser, grab bars, soap dispenser, folded paper towel dispenser, waste receptacle. 6. Replace exhaust fan W/ PANASONIC FV-0511VKS2 OR EQ.. C.F.M. 110 ; R.P.M. 950; 120V TWO SPEED; STEP UP SPEED VIA WALL OCCUPANCY SPEED 7. Paint the affected areas. 8. Work either shown on the Drawings or included in the specifications unless specifically indicated not to be done. 9. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 10. Providing and restoring, where appropriate, all temporary facilities. 11. Prepare and submit Operation and Maintenance O&M Manuals(1 3-ring binder) and a full PDF copy. B. Execution of Work: Work to be performed in timely and workmanlike fashion. Site must be cleaned up daily with access needed for overnight. ADA Shower Renovation.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents