Similar Projects
2021 Concrete Trail
Infrastructure
Bidding
$221,800 est. value
West Des Moines, IA

2022 Storm Extension and Stabilization Project
Infrastructure
Bidding
$390,000 est. value
Johnston, IA 50131

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

Valley Junction Business District Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA 50265

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

2021 Sidewalk Replacement Program
Infrastructure
Results
$310,000 est. value
Des Moines, IA

NE 36th Street Reconstruction
Infrastructure
Bidding
$4,765,160 est. value
Ankeny, IA 50021

Sidewalk and Crossing Guard Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA

Columbus Park Shelter and Police Station Parking Lot Improvements
Infrastructure
Results
$710,000 est. value
Des Moines, IA 50315

2022 Asphalt Street Resurfacing Program - South West Road
Infrastructure
Bidding
$319,500 est. value
Ankeny, IA 50023

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Grandview Golf Course Cart Path Repairs
Infrastructure
Results
$303,000 est. value
Des Moines, IA 50317

City-Wide Skywalk Joint Seal Replacements
Infrastructure
Bidding
$150,000 est. value
Des Moines, IA

Joint Airbase Concrete Ramp Repair
Infrastructure
Post-Bid
Des Moines, IA 50321

Installation of Handicap Accessible Ramps
Infrastructure
Results
Polk City, IA

Last Updated 04/08/2022 10:36 AM
Project Title

Trails End Mitigation Bank Wetland Restoration

Physical Address View project details and contacts
City, State (County) Altoona, IA 50009   (Polk County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes approximately 470,000 CY of excavation, approximately 1,800 SY of granular parking lot, approximately 17,500 LF of earthen trail, transporting and stockpiling of soil, on water control structure, erosion control, and miscellaneous associated work necessary to complete the project.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents