Similar Projects
Bridge Repair
Infrastructure
Bidding
$900,000 CJ est. value
Partridge, KS 67566

Bridge Repair
Infrastructure
Bidding
$900,000 CJ est. value
Partridge, KS 67566

Construction of Orchard Park Event Center at Orchard Park
New Construction, Infrastructure - 4,200 SF
Post-Bid
$1,317,309 CJ est. value
Hutchinson, KS 67502

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

Residential Street Maintenance
Infrastructure, Alteration
Results
$1,853,644 est. value
Hutchinson, KS

Reno County Sheriff's Office Shooting Range
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Hutchinson, KS 67501

Chip Seal. k-68; Ka 6374-01; Fr k-33/k-68 Jct e 1.027 Mi to Fr/Mi Co Ln in Fr Co. Ka 6375-01; Fr Fr/Mi Co Ln 12.40 Mi e to u-169/k-68 Jct In Mi Co. Length 13.414 Mi.
Infrastructure
Results

Milling and HMA Overlay
Infrastructure
Results

11th Avenue Reconstruction - Harsha Canal to Main Street
Infrastructure
Results
Hutchinson, KS

Arterial Street Maintenance
Infrastructure
Results
$730,000 est. value
Hutchinson, KS

CCLIP Resurfacing K61 from US50 to 17th Avenue
Infrastructure
Results
$1,211,209 CJ est. value
Hutchinson, KS 67501

Grading and Bridge
Infrastructure
Results
$970,188 CJ est. value
Willowbrook, KS 67502

Last Updated 11/03/2022 02:06 PM
Project Title

Woodie Seat Improvements Corridor Study

Physical Address View project details and contacts
City, State (County) Hutchinson, KS 67501   (Reno County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hutchinson (the City) is seeking qualification statements from engineering firms with expertise in intersection, interchange, highway design, and traffic modeling to complete a corridor study that considers the feasibility of terminating the Woodie Seat Freeway at Avenue F in Hutchinson, Kansas. This study will supplement an existing TEAP study performed to review options for the Woodie Seat Freeway and Avenue A interchange. All questions regarding the project must be received via the above email by March 11, 2022, or may not be answered. On November 1, 2022, the Hutchinson City Council voted 3-2 in opposition of a plan to construct a pedestrian tunnel under a reconstructed Woodie Seat Freeway. Instead, the City will proceed with a plan to remove the Avenue B bridge and move new sidewalks on reach side of the roadway connecting it to Avenues A and C. Design will proceed. A 60% plan check is anticipated in April 2023, with a final check in November 2023 prior to the project being advertised for construction bids. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents