Similar Projects
Steam Manholes on the UMASS Amherst Campus
Post-Bid
Less than $15,000,000 est. value
Amherst, MA

Water Distribution and Collection System Supplies
Post-Bid
Amherst, MA

Contracts 2019 - Sewer & Drain Repairs
Term Contract
Results
$400,000 est. value
Northampton, MA 01060

Barnes Street Disinfection Pipe Loop
Results
$85,000 est. value
Ware, MA 01082

Indoor Pipe Insulation Maintenance
Post-Bid
Less than $90,000 est. value
Amherst, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Meters, Meter Radio Transmitters and Large Diameter Meters
Infrastructure
Post-Bid
Amherst, MA

Church Street Sanitary Sewer Repair Project
Results
Less than $45,000 est. value
Ware, MA

Fire Hydrants
Infrastructure
Post-Bid
Northampton, MA

Emergency Water System Repairs
Results
Less than $200,000 est. value
Northampton, MA 01060

Installation of an 8" Water Service Across Route 202 (State Street)
Results
Less than $50,000 est. value
Belchertown, MA

West Street Sewer Expansion Phase I
Results
$2,500,000 est. value
Hatfield, MA 01038

Forbes Library Drainage Project
Results
Less than $155,000 est. value
Northampton, MA 01060

Route 10 (College Highway) Water Main
Results
Less than $1,000,000 est. value
Southampton, MA

Atwood Drive Water Line Replacement and Paving
Results
$493,000 est. value
Northampton, MA 01060

Reported 07/29/2021 12:00 AM
Project Title

Lyman Street Smart Growth District Project

Physical Address View project details and contacts
City, State (County) South Hadley, MA   (Hampshire County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,795,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 5,000 foot long project involving the partial replacement of an existing 10” water main, 6” sewer main replacement, full depth reclamation of the existing roadway, along with construction of new cement concrete sidewalk and a new HMA shared use path. The project features 3 crossings with installed Rectangular Rapid Flashing Beacon (RRFB) and new drainage improvements where necessary.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents