Similar Projects
Kump Field Parking Lot- City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

Newton Field Parking Lot - City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

West Wendover Community Rec Center
New Construction, Infrastructure - 25,000 SF
Design
$5,000,000 CJ est. value
West Wendover, NV 89883

Ash Street Village Townhomes
New Construction, Infrastructure
Design
$4,526,400 CJ est. value
Elko, NV 89801

FY-24 Asphalt Maintenance
Infrastructure
Bidding
$300,000 CJ est. value
Elko, NV 89801

Ruby Vista Drive Curb and Gutter
Infrastructure
Bidding
$300,000 CJ est. value
Elko, NV 89801

Bridge Construction SFIR 3(1)
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Elko, NV 89801

Indian Bend Bridge
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Elko, NV 89801

Cold Mill, Place Plantmix Bituminous Surface With Open Grade, Barrier Rail, Guard Rail, Sign, Striping, Hydraulic, Structure, Lighting, and Its Improvements
Infrastructure
Results
$33,300,000 CJ est. value
Wells, NV 89835

Angel Park Apartments
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Elko, NV 89801

Elko Retail Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Elko, NV 89801

Chris Sherrin Way Parking Lot - City of Elko
Infrastructure
Conception
$500,000 CJ est. value
Elko, NV 89801

Ash Street Village Townhomes
New Construction, Infrastructure
Design
$4,526,400 CJ est. value
Elko, NV 89801

SR 227 and SR 233 - Crack seal
Infrastructure
Post-Bid
$890,000 CJ est. value
Elko, NV 89801

Newton Field Parking Lot - City of Elko
Infrastructure
Conception
$600,000 CJ est. value
Elko, NV 89801

Last Updated 06/27/2023 11:04 PM
Project Title

New Domestic Water Well Drilling (Gallagher Fish Hatchery and Spring Creek Rearing Station)

Physical Address View project details and contacts
City, State (County) Ruby Valley, NV 89833   (Elko County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $521,776 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The term Work includes all labor, materials, services, equipment, tools, transportation, power, water, permanent and temporary utilities, utility connections, provisions for safety, and all incidental and other things necessary to produce the finished construction as described by the Bid Documents Site Directions: Gallagher Fish Hatchery HC 60, Box 870 Ruby Valley, Elko County, Nevada, 89833 Spring Creek Rearing Station 1067 East Snake Canyon Road Baker, White Pine County, Nevada 89311 Description: Base Bid Description: Gallagher: install new domestic well; Spring Creek: deepen existing domestic well. Contract Time: 30 calendar days. Liquidated Damages: $500.00 per day. Prevailing Wages must be paid on this project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents