Similar Projects
2022-2027 Lawn and Landscape Maintenance Services
Term Contract
Bidding

2022-2027 Lawn and Landscape Maintenance Services
Term Contract
Bidding

Tree Removal at Schenectady Pine Barrens
Post-Bid
Schenectady, NY

Lawn Care
Post-Bid
Bombay, NY 12914

On Post Grass Cutting
Results
West Point, NY

Irrigation Replacement at Soaring Eagles Golf Course at Mark Twain State Park
Results
Less than $2,800,000 est. value
Horseheads, NY 14845

Nazareth College Shelter Site Development
Infrastructure
Bidding
Rochester, NY

Athletic Field Maintenance
Term Contract
Post-Bid
Bardonia, Congers, New City, West Nyack, NY

2020-2021 Athletic Field Turf Management
Term Contract
Results
Red Hook, NY 12571

Tree Service
Term Contract
Bidding
Hyde Park, NY

Tree Removal Services
Post-Bid
Plattsburgh, NY 12901

Grounds Maintenance Services - Binghamton USARC, 721 Stanton Hill Road Nichols, NY 13872
Results
Nichols, NY 13872

Insecticide Treatments on Hemlock and Ash Trees
Post-Bid

Metro Landscaping
Results
Syracuse, NY 13202

Rumsey Woods Trail Improvements - Phase 2
Post-Bid
Delaware, NY

Reported 11/30/2021 12:00 AM
Project Title

Topsoil and Mulch Materials

Physical Address View project details and contacts
City, State (County) NY   (Ontario County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall consist of furnishing, screening, storing, stockpiling and placing topsoil. Topsoil. The topsoil shall be free from refuse, material toxic or otherwise deleterious to plant growth, subsoil, sod clumps, seeds or other viable propagules of invasive plants, woody vegetation and stumps, roots, brush, refuse, stones, clay lumps, or similar objects. Construction and demolition debris as classified under 6 NYCRR Part 360, other than uncontaminated land clearing debris, shall not be used to manufacture or amend topsoil. Mulch. The mulch shall be commercially available double or triple-processed aged bark mulch made from a mixture of hardwood and/or softwood. It shall be created by regrinding the mulch in a tub grinder and be finely screened to a uniform particle size. It shall be composed of bark and have a low wood content with no hidden woods from construction and demolition debris or pressure treated lumber.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Mulching, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents