Similar Projects
Silver Spring Lake Dam Rehabilitation
Renovation
Bidding
North Kingstown, RI

Low-Level Outlet System Repair and Maintenance - Stillwater Reservoir Dam
Results
Smithfield, RI 02917

Wyoming Upper Reservoir Dam Repairs
Results
Hope Valley, RI

Woonsocket Reservoir No. 1 Dam Improvements
Results
Lincoln, North Smithfield, RI

Reported 09/03/2021 12:00 AM
Project Title

CSO Phase III A-5 of-217 Consolidation Conduit Contract

Physical Address View project details and contacts
City, State (County) Providence, RI   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of construction of a consolidation conduit, new outfall pipe, and associated structures and appurtenances at the site in Pawtucket, RI. Work includes preparation of the site, construction of a consolidation conduit with segments installed by both conventional trench and microtunnel installation techniques, construction of a diversion structure to divert flow from the outfall to the consolidation conduit, construction of a relocation structure to divert flow from the existing outfall to a newly constructed outfall, construction of a new outfall pipe, protection and relocation of existing utilities, and paving.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents