Similar Projects
Mobile Operations Center (Hangar)
Renovation, Addition
Conception
$2,200,000 est. value
Pasadena, CA

Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

RFP D/B - San Gabriel Valley Aquatic Center
New Construction, Infrastructure
Post-Bid
$26,000,000 CJ est. value
La Puente, CA 91744

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

Various Minor Capital Construction Projects
New Construction
Results
Less than $752,000 est. value
Compton, CA 90220

Bus Hydrogen Refueling Station Consulting And Project Management Services
Renovation
Results
Santa Clarita, CA 91355

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

San Pedro Courthouse Redevelopment / Los Angeles
New Construction, Infrastructure, Build-out - 361,500 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90731

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

Expo/Crenshaw Transfer Station Improvements - Los Angeles County Metropolitan Transportation Authority
Infrastructure, Renovation
Conception
$999,000,000 CJ est. value
Los Angeles, CA 90012

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
$97,000,000 CJ est. value
West Hollywood, CA 90046

IDIQ MACC Small Business Set-Aside for New Construction, Renovation, and Repair of Dry Utilities Construction Projects at Various Government Installations In CA, AZ, NV, UT, CO, and NM
New Construction, Renovation, Term Contract
Post-Bid
$300,000 to $20,000,000 est. value

Last Updated 04/07/2023 02:46 AM
Project Title

Civic Center Central Plant Boilers and Chillers Replacement

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90012   (Los Angeles County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The CMAR Contractor shall be responsible for all Pre-Construction and Construction Services required for the completion of the Project in accordance with the Contract Documents. The Los Angeles County Public Works is requesting Construction Manager at Risk proposals from interested firms for pre-construction and construction services for the County Civic Center Central Plant Boilers and Chillers Replacement Project located at 301 North Broadway, Los Angeles, CA 90012. A pre-submittal virtual conference to answer questions concerning the project will be Microsoft Teams. Subconsultants are not required to attend. Those who wish to attend must click the link that will be posted on the Public Works website for BRC0000380 to join. County will conduct a mandatory site visit at the project site to provide information regarding the project. Prime proposers must attend. Proposers are responsible for their own parking. Enter the facility on the corner of Hill and Temple by paging the guardshack/sliding gate. Proposers must submit questions in writing and request information for this solicitation by 14 calendar days prior to the submittal deadline. If you have any questions regarding this RFP, you may contact Ms. Erayna Chang at (626) 300-2325 or by e-mail at EQChang@pw.lacounty.gov. The proposed project will be delivered in multiple phases to maintain the plant operation during construction of the improvements. The initial phase of the project consists of the demolition and make-ready work, which includes removal of the nonfunctioning chiller, the demolition of the cogeneration equipment, the initial remodeling of the electrical infrastructure, and the installation of new chillers and boilers to comply with AQMD regulations. This work is expected to be completed with County furnished equipment and JOC construction services and with County furnished equipment and potentially CMAR construction services. Construction of the initial phase of work is scheduled to be completed by September 2023 Initial Phase Work : Demolition, Make-Ready construction, and replacement of Chillers and Boilers to meet SCAQMD regulations (currently in construction with JOC) - CMAR Work: Cooling tower replacement, seismic and structural upgrades, installation of electrical switchgear, and potential thermal storage CMAR will be responsible for constructing the complete Project while minimizing impact to the operations of the facility and Project stakeholders. CMAR to perform all work necessary to complete the Project within the Contract Time and GMP. If you have any questions regarding this Notice to Proposers D, you may contact Ms. Erayna Chang at (626) 300-2325 or EQChang@dpw.lacounty.gov.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents