Similar Projects
Anderson amd Church Water Mains
Bidding
Barnet, VT 05821

Morgan Springs Bulk Water Fill Station
Bidding
Bennington, VT 05201

Country Club of Bolton Homeowners Condominium Association Water System Improvement
Post-Bid
$445,200 est. value
Bolton, VT 05465

Addison County Community Trust Otter Creek Mobile Home Park Water System Improvements
Post-Bid
Less than $200,000 est. value
Vergennes, VT

Water System Remedial Expansion, Contract 8
Results
$2,000,000 to $3,000,000 est. value
Bennington, VT 05201

Water System Remedial Expansion, Contract 9
Results
$2,500,000 to $3,500,000 est. value
Bennington, VT 05201

Water System Improvements
Post-Bid
Hyde Park, VT 05655

Cortina Dry Hydrant Installation Project
Results
Mendon, VT

Ductile Iron Pipe 2021
Post-Bid
Rutland, VT

Bridge Street Infrastructure Replacement Project
Results
Richmond, VT 05477

Live Insertion Valves and Line Stops
Post-Bid
Rutland, VT

Water System South End Upgrades, Phase III, Dewey to Weeks Extension
Results
$300,000 to $350,000 est. value
Bennington, VT 05201

Milton Mobile Home Cooperative Water And Sewer Improvement Project
New Construction
Post-Bid
Less than $1,500,000 est. value
VT 05468

Middlebury Police Department Water and Site Improvements
Results
$325,000 est. value
Middlebury, VT 05753

Valve Exercising at Public Community Drinking Water Systems
Term Contract
Post-Bid
$50,000 est. value

Last Updated 12/03/2019 09:33 AM
Project Title

Randall Park Road Water Main Replacement

Physical Address View project details and contacts
City, State (County) Pittsford, VT 05763   (Rutland County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of approximately 1,000 feet of water main running along Randall Park Road in Pittsford. The current, rather brittle 1 1/4”-inch galvanized pipe, located approximately 5‘ feet below grade, will be replaced with EITHER 2” HDPE pipe OR 8” ductile iron pipe, with two bid alternatives requested. The Contractor will also make connections between the new pipeline and five (5) service lines. The Contractor will also be asked to install EITHER a 2” inch flushing hydrant with a shut-off (with curb box) OR a Kennedy K-8 fire hydrant to include a shut-off valve. Contractor is responsible for supplying all materials. The Contractor is responsible for supplying all traffic control, labor, equipment, erosion control measures and excavation. Contractor will also be responsible for site restoration (including grass seed and mulching).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents