Similar Projects
Waterline to Serve Lift Station No. 3 and Spring ISD
Results
TX

Mt. Enterprise Waterline System Improvements
Results
$870,000 est. value
Mount Enterprise, TX 75681

Site Electrical and Water Distribution Replacement
Results
Less than $425,300 est. value
El Paso, TX 79905

Construction of Water, Sanitary, Drainage and Paving Facilities for Audubon Creekside North Sec. 1
Results
$1,000,000 est. value
Montgomery, TX

Water Distribution, Sanitary Sewer and Drainage Facilities to Serve Woodland Lakes Section 4
Results
TX

Enclave at Cypress Springs
Results
TX

PA-1 Utility Extension
Results
TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Packery Channel Restoration - H17019
Results
Corpus Christi, TX

White Oak Bayou Harvey Repairs in Harris County, Texas
Results
$1,000,000 to $5,000,000 est. value
Houston, TX 77022

Brays Bayou Harvey Repairs in Harris County, Texas
Results
$1,000,000 to $5,000,000 est. value
Houston, TX 77022

Freeport Harbor Levee Stabilization Wall Project
Results
Freeport, TX 77541

Stanley Lake Waterline Extension
Results
Montgomery, TX 77356

General Repairs in Southwest Harris County forthe Harris County Flood Control District
Results
Less than $974,153 est. value
Houston, TX

CIDC Conroe Park West Roadway and Utilities
Results
Less than $14,500,000 est. value
Conroe, TX 77301

Last Updated 04/25/2022 05:53 AM
Project Title

Water - Sanitary Sewer - Drainage and Detention to Serve Newport Sections 6 and 10

Physical Address View project details and contacts
City, State (County) Newport, TX 76230   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Approx: 3,000 LF of 4"- 8" Waterline 2. Approx: 3,200 LF of 8" Sanitary Sewer 3. Approx: 2,500 LF of 24" RCP Storm Sewer 4. Approx: 13,500 CY of Detention Pond Excavation.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents