Similar Projects
Bridge Painting at 30 (BIN) Locations
Infrastructure
Design
$6,705,540 CJ est. value
Buffalo, NY 14209

Tank Demolition - Contract 2 - Water Storage Tank Demolition
Demolition, Infrastructure
Sub-Bidding
$80,000 CJ est. value
Kenmore, NY 14217

EPA Certified Lead Abatement Contractors
Alteration
Post-Bid
Mount Vernon, NY 10550

IDIQ Biological, Environmental and Cultural Resources Services
Term Contract
Post-Bid

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Asbestos Cement Pipe (ACP) and Asbestos Containing Materials (ACM) Abatement, Removal, and Disposal
Term Contract
Results
Cheektowaga, NY

Term Contract for Asbestos Abatement Services
Term Contract
Post-Bid
Buffalo, NY 14203

Asbestos Abatement and Select Demolition
Alteration
Results
Buffalo, NY 14207

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Asbestos Abatement and Select Demolition - Phase 2
Demolition, Alteration
Results
Buffalo, NY 14207

Hazardous Waste Materials Disposal
Alteration
Post-Bid

Curtain Wall Replacement and Hazardous Materials Abatement
Alteration
Results
$2,200,000 to $2,400,000 est. value
Buffalo, NY 14214

Corridor Ceiling and Lighting Abatement and Rehab - Cleveland Hall
Alteration
Post-Bid
Buffalo, NY 14222

Lehigh Valley Section House: Exterior Asbestos Abatement
Alteration
Results
$50,000 est. value
Williamsville, NY 14221

Soil Disposal At 29 LNA Sites
Term Contract, Alteration
Post-Bid

Last Updated 08/16/2022 09:32 PM
Project Title

Tank Demolition - Contract 1 - Lead Based Paint Removal

Physical Address View project details and contacts
City, State (County) Kenmore, NY 14217   (Erie County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of removal of lead based paint on portions of the existing water storage tank, and subsequent demolition of the existing water storage tank. Separate Bids will be received for Contract No. 1 - Water Storage Tank Demolition. Bids shall be on a lump sum and unit price basis for all contracts. Any bid may be withdrawn without prejudice prior to the official bid submission time or any publicized postponement thereof. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. Bid security shall be furnished in accordance with the Instructions to Bidders. Attention of bidders is particularly called to the requirements as to condition of employment to be observed and to the minimum wage rates to be paid under the Contract. Refer to Instructions to Bidders & Bid Form for requirements regarding modifications and withdrawing of bids. The Work will be substantially completed on or before November 30, 2022

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Subsurface Investigation, Site Remediation, Asbestos Remediation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents