Similar Projects
Grand Ridge over Bills Run - Grundy County
Infrastructure
Conception
$600,000 CJ est. value
Grand Ridge, IL 61325

Grand Ridge over Bills Run - Grundy County
Infrastructure
Conception
$600,000 CJ est. value
Grand Ridge, IL 61325

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Non-MFT Street Program
Infrastructure
Results
Mendota, IL

2022 RBI/MFT Street Program
Infrastructure
Results
Peru, IL

Etna Road Mixed-Use Building
Renovation, Infrastructure
Conception
$5,000,000 CJ est. value
Ottawa, IL 61350

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2022 Cape Seal
Infrastructure
Results
Ottawa, IL

2024 Bond - New Lincoln Elementary School - Ottawa Elementary School District 141
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Ottawa, IL 61350

Rowe Street and Various
Infrastructure
Post-Bid
$8,351,000 est. value
Sheridan, IL

Micro Surface
Infrastructure
Results
Ottawa, IL

Construction of Three Hot Mix Asphalt Pavement Pads
Infrastructure
Post-Bid
$311,000 CJ est. value
Streator, IL 61364

Parking Lot Upgrades
Infrastructure
Results
Oglesby, IL 61348

RFQ - Various Phase I/II Structure Projects, Various Routes
Term Contract
Post-Bid
$1,000,000 CJ est. value
Ottawa, IL 61350

Last Updated 09/18/2023 11:15 AM
Project Title

Clark Street Sewer Separation

Physical Address View project details and contacts
City, State (County) Oglesby, IL 61348   (La Salle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description Pavement reconstruction, ADA sidewalk ramps, and storm sewer work. The start date for this project shall be June 3, 2024.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents