Similar Projects
Snow Removal
Term Contract
Sub-Bidding
Telluride, CO 81435

Demolition and Removal of Flower Box
Term Contract
Sub-Bidding
Centennial, CO 80112

Environmental Assessment for Construction and Demolition Projects at the 233rd Space Group Greeley Air National Guard Station
Renovation, Demolition
Post-Bid
Greeley, CO 80631

CalGulch Groundwater Monitoring
Term Contract
Post-Bid
Denver, CO

Asbestos Abatement Contractors for Asbestos Abatement at Ortega Middle School
Results
$30,000 to $40,000 est. value
Alamosa, CO 81101

MSS Environmental Abatementa and Removal
Results
$50,000 est. value
Denver, CO

CMAFS Water Treatment, Testing and Monitoring
Term Contract
Post-Bid
Colorado Springs, CO 80906

Water and Soil Testing WCAO 2022
Results

Hazardous Waste Services
Alteration
Post-Bid
Boulder, CO

712 Widefield Drive Demolition/Abatement Project
Demolition
Results
Colorado Springs, CO 80911

On-Call Environmental Testing Services SBE
Term Contract
Post-Bid
CO

Planning Asbestos Abatement and Demolition of Abandon Adobe Structure
Demolition - 735 SF
Results
Towaoc, CO

Asbestos Bulk Sampling at Sangre De Cristo Apartments
Alteration
Post-Bid
Pueblo, CO 81004

1099 Kachina Drive Demolition/Abatement Project
Demolition, Alteration
Results
Colorado Springs, CO 80915

Small Job Asbestos Abatement Contracting
Term Contract, Alteration
Post-Bid
CO

Last Updated 09/15/2022 06:05 PM
Project Title

DRUM Bishop Point Project

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Work Will Include Safeguarding a Total of 37 Features Including 35 Adits, 1 Shaft and 1 Subsidence Features. Closure Methods Will Include Grates, Corrugated Steel Pipes, Backfill, Polyurethane Foam, Bulkhead, and Cable Nets. Some Features Will Include Bat Compatible Grates or Otherwise Require Bat Exclusions Prior to Backfill or Bulkhead. The Uranium Mine Closure Safety, Health and Environmental Action Plan Requirements Will Be Applied.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents