Similar Projects
Proposition A - 2023 Bond - Andrews Independent School District
New Construction, Build-out, Renovation, Infrastructure
Conception
$108,820,000 CJ est. value
Andrews, TX 79714

Proposition B - 2023 Bond - Andrews Independent School District - 6159445
New Construction, Renovation, Infrastructure
Conception
$35,835,000 CJ est. value
Andrews, TX 79714

Bandera County Annex Building Construction
New Construction, Infrastructure
Design
Bandera, TX 78003

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Widen Road - Add Shoulders- SH 16
Infrastructure
Bidding
$7,293,348 CJ est. value
Bandera, TX 78003

Mill and Inlay - US 59
Infrastructure
Bidding
$1,000,000 CJ est. value
Lufkin, TX 75904

FourWay Special Utility District Hanks Creek Water System Extension
Infrastructure
Post-Bid
$367,031 CJ est. value
Huntington, TX 75949

Northeast Loop 287 Utility Relocation
Infrastructure
Post-Bid
$1,386,846 CJ est. value
Lufkin, TX 75901

Paving, Drainage, Water and Sanitary for Cane Crossing Estates, Sealy, Austin
Infrastructure
Results
$5,387,371 CJ est. value
Sealy, TX 77474

RCA Parking and Public Facilities Improvements
Infrastructure
Results
$654,981 est. value
TX

New Water and Wastewater Lines on South Sylvan
Infrastructure
Construction
$286,155 CJ est. value
Palestine, TX 75801

Project Echo - SpaceX Facility / Texas
New Construction, Infrastructure - 521,521 SF
Construction
$43,000,000 CJ est. value
Bastrop, TX 78602

Butler Park Apartments Multifamily Development
New Construction, Infrastructure - 68,841 SF
Pending Verification
$18,776,400 CJ est. value
Andrews, TX 79714

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Proposition C - 2023 Bond Passed - Andrews Independent School District - 6159445
Infrastructure, Build-out
Conception
$12,075,000 CJ est. value
Andrews, TX 79714

Last Updated 06/06/2023 06:38 PM
Project Title

Big Spring/Odessa Pump Station Repairs

Physical Address View project details and contacts
City, State (County) Big Spring, TX 79720   (Howard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,030,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work is described in the following general, non-exhaustive terms as: Demolition and replacement of portions of the inlet works, and discharge piping at the Big Spring/Odessa Raw Water Pump Station. Please direct all questions related to the design of this Project to the Q&A Section 180 calendar days maximum allowable for substantial completion A non-mandatory pre-bid conference for the Project will be held on May 17, 2023, at 10:00 AM

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents