Similar Projects
Last Updated | 11/14/2022 02:33 PM |
Project Title | RFP Engineering - SR 916/NW 135 St and NW 136 St from W. of NW 30 Ave |
Physical Address | View project details and contacts |
City, State (County) | Hialeah, FL 33014 (Miami-Dade County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected June 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,477,863 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 4, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024 *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) This is a Business Development Initiative. District : 06 Selection Method : Letter of Response and Abbreviated Technical Proposal SR 916/NW 135 St & NW 136 St from W. of NW 30 Ave TRC Members (Subject to Change) : Hector Di Donato Ileana Alvarez Ryan Raghunandan RRR Project along SR 916/NW 135 ST & NW 136 ST FROM W OF NW 30 AVE TO W OF NW 27 AVE. Project improvements include: milling and resurfacing of existing roadway pavement, modification of geometry at the northwest corner of the intersection of 136th Street and 27th Ave, to connect NW 136th Street to Opa-Locka Blvd., new drainage improvements, repairing/replacing damaged inlet tops, drainage structures relocation, utility coordination, updating existing deficient pedestrian features such as sidewalks, pedestrian curb ramps, detectable warning surfaces, adding new pedestrian crossings, and pedestrian crossing signs and plaques. Improvements also include signing and pavement markings, signalization, ITS, lighting, and landscaping. Transit Coordination with MDC is expected as this project includes the relocation of a bus stop. Financial Management Number(s) 447805-1-32-01 Longlist Date/Time 9/15/2021 Shortlist Selection Date/Time 9/20/2021 Phase II Submittal Deadline Date/Time 10/06/2021 Final Selection Date/Time 11/01/2021 Negotiations Period Begin Date 11/09/2021 Negotiations Period Ending Date 12/31/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 976/ SW 40 St/ Bird Road from East of SR 826 to SW 58 Ave |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |