Similar Projects
Treasure Island Elementary School Community Park - Construction - CP23-07 - North Bay Village
New Construction, Infrastructure
Conception
$2,703,546 CJ est. value
North Bay Village, FL 33141

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Brickell Gateway Tower
New Construction, Infrastructure
Construction
$150,000 CJ est. value
Miami, FL 33130

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

M-Tower
New Construction, Infrastructure, Renovation - 10,531 SF
Design
$170,000,000 CJ est. value
Miami, FL 33130

Construction Services for a Roadway Improvement
Post-Bid
Miami Shores, FL 33150

Doral Pedestrian Bridge Design Build
Results
Doral, FL

Farmasi Cosmetics Office and Distribution Facility
New Construction, Infrastructure - 80,000 SF
Construction
$9,000,000 CJ est. value
Doral, FL 33172

Last Updated 11/14/2022 02:33 PM
Project Title

RFP Engineering - SR 916/NW 135 St and NW 136 St from W. of NW 30 Ave

Physical Address View project details and contacts
City, State (County) Hialeah, FL 33014   (Miami-Dade County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,477,863 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 4, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024 *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) This is a Business Development Initiative. District : 06 Selection Method : Letter of Response and Abbreviated Technical Proposal SR 916/NW 135 St & NW 136 St from W. of NW 30 Ave TRC Members (Subject to Change) : Hector Di Donato Ileana Alvarez Ryan Raghunandan RRR Project along SR 916/NW 135 ST & NW 136 ST FROM W OF NW 30 AVE TO W OF NW 27 AVE. Project improvements include: milling and resurfacing of existing roadway pavement, modification of geometry at the northwest corner of the intersection of 136th Street and 27th Ave, to connect NW 136th Street to Opa-Locka Blvd., new drainage improvements, repairing/replacing damaged inlet tops, drainage structures relocation, utility coordination, updating existing deficient pedestrian features such as sidewalks, pedestrian curb ramps, detectable warning surfaces, adding new pedestrian crossings, and pedestrian crossing signs and plaques. Improvements also include signing and pavement markings, signalization, ITS, lighting, and landscaping. Transit Coordination with MDC is expected as this project includes the relocation of a bus stop. Financial Management Number(s) 447805-1-32-01 Longlist Date/Time 9/15/2021 Shortlist Selection Date/Time 9/20/2021 Phase II Submittal Deadline Date/Time 10/06/2021 Final Selection Date/Time 11/01/2021 Negotiations Period Begin Date 11/09/2021 Negotiations Period Ending Date 12/31/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 976/ SW 40 St/ Bird Road from East of SR 826 to SW 58 Ave

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents