Similar Projects
Beechurst and 1st St Intersection Improvements - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

RFQ Design - New College and Career Ready Facility Addition to the Existing Poca High School
Addition, Demolition, New Construction, Infrastructure
Conception
$24,598,000 CJ est. value
Poca, WV 25159

Health Department Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Martinsburg, WV 25403

Paving Parking Lots 28 and ST5
Infrastructure
Design
$115,070 CJ est. value
Morgantown, WV 26505

Multi-Well Federal Plugging Contract Region V
Infrastructure
Bidding
Charleston, WV 25301

Resurfacing - Peach Tree Orchard
Infrastructure
Bidding
$1,500,000 CJ est. value
Persinger, WV 26651

D6 2023 Rem Guardrail
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Moundsville, WV 26041

Vernicks Road
Post-Bid
WV

Blennerhassett Condensing Water Piping Replacement
Post-Bid
Parkersburg, WV

Water System Improvements
Results
Less than $1,921,000 est. value
Augusta, WV 26704

Proposed Water Line Replacement - Contract 1
Results
Paden City, WV 26157

Stockert Youth & Community Center
New Construction, Infrastructure
Pending Verification
$3,600,000 CJ est. value
Buckhannon, WV 26201

Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Phase II Wastewater System Improvements Contract #1 - Sanitary Sewer Line Replacement and Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Ellenboro, WV 26346

Redevelopment of Property 1341 Washington Street East
Infrastructure
Post-Bid
Charleston, WV 25301

Last Updated 08/17/2022 08:04 AM
Project Title

Grandview Doolin Public Service District - Robinson Ridge Water Line Extension

Physical Address View project details and contacts
City, State (County) New Martinsville, WV 26155   (Wetzel County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $706,982 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Unit price contract to construct approximately 18,180 feet of 4", 3", and 2" waterline, 43 feet of highway borings, 133 feet of highway open cuts, 475 feet of horizontal directional drilling, 7 gate valves, 1 flushout assemblies, 2 fill hydrants, making 1 tie-in to existing mains and other work required to provide a complete operating water system. If Contractor intends to let any subcontractors for a portion of the work, Contractor shall take affirmative steps to assure that small, minority and women's businesses are used when possible as sources of supplies, equipment, construction, and services. Affirmative steps shall consist of: (1) including qualified small, minority and women's businesses are used when possible as sources of supplies, equipment, construction, and services; (2) assuring that small, minority and women's businesses are solicited whenever they are potential sources; (3) dividing total requirements when economically feasible, into small tasks or quantities to permit maximum participation of small, minority and women's businesses; (4) establishing delivery schedules, where the requirements of the work permit, which will encourage participation by small, minority and women's businesses; (5) using the services and assistance of the Small Business Administration and the Minority Business Development Agency of the U.S. Department of Commerce; (6) requiring each party to a subcontract to take the affirmative steps of this section; and (7) Contractor is encouraged to procure goods and services from labor surplus area firms A five percent (%5) Bid Bond or certified cashier's check must accompany all bids. The Owner reserves the right to waive any informalities or to reject any or all bids. No Bidder may withdraw his bid within 90 days after the actual date of the opening thereof.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents