Similar Projects
2021 Storm Sewer Inspection
Infrastructure
Results
Richland, MS

Polypropylene Resin Storm Drain Pipe FY22 Commodity
Infrastructure
Post-Bid
Brandon, MS

Concrete Storm Drain Pipe FY22 Commodity
Infrastructure
Post-Bid
Brandon, MS

Annual Bid for Polyethylene and Polypropylene Pipe
Term Contract
Post-Bid
Hernando, MS

Airport Storm Drain and Sanitary Sewer
Infrastructure
Results
Bolton, MS 39041

Buena Vista Street - South of Washington Avenue Infrastructure Improvements
Infrastructure
Results
$339,856 est. value
Pascagoula, MS 39567

Indiana Avenue Storm and Sanitary Sewer Extensions
Infrastructure
Results
$308,240 est. value
Vicksburg, MS

Miscellaneous Water, Sewer, and Drainage Maintenance Contract - 2021
Infrastructure
Post-Bid
Pascagoula, MS

Last Updated 10/05/2021 03:35 PM
Project Title

Delta National Forest Culvert Replacement

Physical Address View project details and contacts
City, State (County) Rolling Fork, MS 39159   (Sharkey County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace one failed 60” x 60’ corrugated metal pipe culvert with one 72” x 60’ 16 gage polymer coated corrugated metal pipe culvert on Road 703 on the Delta National Forest in Sharkey County, Mississippi. The project location is 1.033 miles west of Highway 16, about four miles west of Holly Bluff, Mississippi. Road 703 is an aggregate surfaced road.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents