Similar Projects
Mill, AC Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration
Infrastructure
Conception
$4,817,000 CJ est. value
Custer, SD 57730

US 385 - Intersection of Carroll Creek Rd.
Infrastructure
Design
$427,000 CJ est. value
Custer, SD 57730

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,976,000 CJ est. value
Custer, SD 57730

WWTF Waste Water Treatment Facility Improvements Phase 3B Transfer Force Main and Lift Station Construction
Renovation, Infrastructure
Bidding
$700,000 CJ est. value
Custer, SD 57730

WWTF Waste Water Treatment Facility Improvements Phase 3B Transfer Force Main and Lift Station Construction
Renovation, Infrastructure
Bidding
$700,000 CJ est. value
Custer, SD 57730

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Structure Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Custer, SD

WWTF Improvements - Phase 1 Golf Course Force Main and WWTF Repairs
Results
$910,000 est. value
Custer, SD

WWTF Improvements - Phase 1B Building Modifications
Renovation
Results
$770,000 est. value
Custer, SD

Underground Infrastructure Inspection
Infrastructure
Post-Bid

North 7th Street Water and Sanitary Sewer Extension
Infrastructure
Results
Custer, SD 57730

Sylvan Lake Store Replacement
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Custer, SD 57730

Structure Demolition and Site Restoration
Demolition, Infrastructure
Results
Custer, SD 57730

Furnishing Granular Materials For Phase 2 & 3 WWTF Improvements Project - Rebid
Renovation, Infrastructure
Results
$229,790 CJ est. value
Custer, SD 57730

Last Updated 09/19/2022 09:38 AM
Project Title

WWTF Wastewater Treatment Facility Improvements Phase 3A Effluent Force Main Construction

Physical Address View project details and contacts
City, State (County) Custer, SD 57730   (Custer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

solicitation - 17-21059 The Project shall consist of the following work: The project includes construction of approximately 3.5 miles of 8 PVC effluent force main pipe, installation of a pressure sustaining valve structure and other miscellaneous appurtenant work. Custer, WWTF Improvements - Phase 3 Effluent Force Main Construction Est. Completion Date: Nov. 17, 2023 Bidders on this work will be required to comply with the Presidents Executive Order Nos. 11246 (Equal Employment) as amended, 11518 (Small Business Concerns), and 11625 (MBE) as amended. The requirements for bidders and contractors under these orders are explained in the specifications. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women's Business Enterprises (WBE) are explained in the specifications. The DBE/MBE and WBE goals for participation in this contract in terms of percentage of contract value are as follows: MBE 1.0 percent; WBE 4.0 percent. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. Please be advised that waivers or exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. A current directory of DBE firms can be found at the SD DOT Compliance Office (605)773-4906 or at Portal. Davis Bacon and Related Acts wages apply to this project. All provisions relative to those acts must be met. Your special attention is invited to the attached DBE Subcontractor Solicitation Information form, DBE Subcontractor Performance Form, DBE Subcontractor Utilization Form, Certification Regarding Debarment, Suspension and Other Responsibility Matters (Debar) form, American Iron and Steel Certification. These forms must be completed and submitted with your bid proposal. Failure to submit these forms may be cause for the bid to be rejected. Please be advised that good-faith efforts will be subjected to close scrutiny and if the good-faith effort submission is unacceptable, your bid will be rejected. The low responsive bidder must assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. Contractors must assure that telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities), and video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities) WILL NOT be supplied for the project. Construction Services in South Dakota are subject to tax under SDCL 10-46A. Contractors shall include the applicable tax in their bid price for each item of work. Tax questions should be directed to the South Dakota Department of Revenue at 800-829-9188. Each bid must be accompanied by bid security payable to the Owner for five (5%) percent of the total amount of the Bid as a certified or bank check issued by a State or National bank or ten percent (10%) as a bidder's bond. With submittal of a Bid, the Bidder represents that he has visited the site, familiarized himself with the local conditions under which the work is to be performed, and correlated his observations with the requirements of the Contract Documents. This project may be partially funded using American Rescue Plan Act (ARPA) funds. As a condition of the ARPA funding guidelines, the Contractor is shall meet the following minimum requirements: 1. Based on the Build America, Buy America provisions of the Infrastructure Investment and Jobs Act (IIJA) and E.O. 14005 which provide that, as appropriate and to the extent consistent with law, a preference will be provided to Contractors for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products.) The Contractor shall provide documentation of their efforts to meet the provisions of Build America, Buy America upon request. 2. The Contractor shall make a good faith effort to utilize Disadvantaged Business Enterprises (DBE) and/or Minority Business Enterprises (MBE) and shall provide documentation of the effort to solicit bids from qualified entities upon request. A copy of the ARPA funding guidance that outlines the requirements associated with projects that utilize this funding can be found at the following link: Portal The Owner reserves the right to reject any and all bids or to accept any bid. Bidder's Proposal shall hold firm for thirty (30) days from the date of opening. Mutually agreed upon extensions of time may be made, if necessary.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents