Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

Lew Clarkson Park Softball Complex Improvements
Renovation
Results
$570,000 est. value
Johnston, IA

Valley Junction Business District Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA 50265

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

Sidewalk and Crossing Guard Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

Truck Entrance Road Rehab and Replacement
Infrastructure
Post-Bid
Johnston, IA

Western Ingersoll Run Sewer Separation Phase 2
Alteration
Results
$6,750,000 est. value
Des Moines, IA

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Valley View Park North Loop Road Extension
Infrastructure
Results
West Des Moines, IA

Last Updated 04/21/2022 09:50 AM
Project Title

Merle Hay Road and Johnston Drive Improvements

Physical Address View project details and contacts
City, State (County) Johnston, IA   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,516,034
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements in Johnston generally described as follows: Construction of the Merle Hay Road and Johnston Drive Improvements including all materials, labor and equipment necessary for the installation of approximately: 34,780 CY of grading, 2,850 CY of modified subbase, 9,470 SY of PCC pavement, 3,380 LF of Curb and Gutter, 475 SY of PCC median, 2,320 TONS of HMA pavement, 4,220 SY of PCC sidewalk and shared use path, 5,740 SY of PCC driveways, 2,015 LF of water main, 775 LF of sanitary sewer, 3,630 LF of storm sewer, 8 EA sanitary manholes, 55 EA storm sewer manholes and intakes, 2,950 LF of subdrain, 120 STA of pavement markings, and traffic signalization.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents