Similar Projects
Jesuit College Preparatory School
Addition
Design
Dallas, TX 75244

Ursuline Academy East Campus
New Construction - 96,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Dallas, TX 75229

West Dallas STEM School Renovation Phase 1
Renovation
Sub-Bidding
Dallas, TX 75212

Renovations to R L Turner High School
Renovation
Post-Bid
$31,936,421 est. value
Carrollton, TX 75006

Lewisville ISD Hebron High School 20-Yr Refresh Project
Post-Bid
Carrollton, TX 75010

LG Pinkston High School - New
New Construction - 226,948 SF
Results
$89,998,250 est. value
Dallas, TX 75212

Renovations to Vivian Field Middle School
Renovation
Results
$29,000,000 est. value
Farmers Branch, TX 75234

Justin F. Kimball High School Auditorium-Addition/Renovation
Renovation, Addition
Construction
$16,258,253 est. value
Dallas, TX 75233

William B Travis Academy/Vanguard for the Academically Talented and Gifted Addition/Renovation
Renovation, Addition
Construction
$10,535,881 est. value
Dallas, TX 75219

The Cambridge School of Dallas
New Construction - 32,500 SF
Pending Verification
$13,500,000 est. value
Dallas, TX 75229

Construction Manager-at-Risk
Post-Bid
Dallas, TX 75233

Construction Manager at Risk
Results
$28,056,797 est. value
Carrollton, TX 75006

Cristo Rey Dallas College Preparatory School Innovation Center
New Construction - 40,000 SF
Construction
$13,000,000 est. value
Dallas, TX 75217

General Construction of A C New Middle School Phase 2 Addition
Addition
Post-Bid
Mesquite, TX 75150

West Dallas STEM School Renovation
Renovation
Results
$17,000,000 to $24,000,000 est. value
Dallas, TX 75212

Last Updated 09/02/2020 09:18 AM
Project Title

Bryan Adams High School Additions and Renovations

Physical Address View project details and contacts
City, State (County) Dallas, TX 75228   (Dallas County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced
Bids Due View project details and contacts
Estimated Value $53,564,351
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Addition of Competition gymnasium, locker rooms, Addition of Fine Arts wing, renovation of existing locker rooms, renovation of existing auditorium, remove and install new Fire Alarm system, remove and replace with new teaching wall surface products (MB/TB), new front entrance with controlled vestibule entry, new marque sign and other new interior signage.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents