Similar Projects
Munitions Load Crew Training Facility
New Construction - 8,279 SF
Design
$5,000,000 to $10,000,000 est. value
Joint Base Andrews, MD

Defense Logistics Agency (Dla) Site Improvements, Fort Meade, Md
Renovation
Design
$10,000,000 to $25,000,000 est. value
Fort Meade, MD 20755

RFQ - Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for facilities
Term Contract
Bidding
$10,000,000 CJ est. value
Annapolis, MD 21401

RFP D/B - Army $499 Million Construction MATOC IDIQ - USACE Baltimore Phase 2
Renovation - 64,369 SF
Bidding
$10,000,000 CJ est. value
Fort Meade, MD 20755

RFQ D/B- Replace Overhead Fire Sprinkler System
Renovation
Sub-Bidding
$4,800,000 CJ est. value
Patuxent River, MD 20670

B2905, B1461, B2925, B2649, & B3261, Fire Panel Replacement Bundle
Renovation
Sub-Bidding
$3,200,000 CJ est. value
Patuxent River, MD 20670

East Campus Building 5 (ECB5) Pre-Construction / Construction Services
New Construction
Post-Bid
Less than $500,000,000 est. value
Fort George Meade, MD 20755

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construct F-16 Flight Simulator Facility
New Construction - 13,000 SF
Results
$5,000,000 to $10,000,000 est. value
Joint Base Andrews, MD

Construct F-16 Flight Simulator Facility at Joint Base Andrews, Maryland
New Construction
Results
Clinton, MD

CBIRF Obstacle Course Repairs
Renovation
Design
Indian Head, MD 20640

B2976 Secure Weapons Assembly Facility
New Construction, Infrastructure - 5,830 SF
Bidding
$10,000,000 CJ est. value
Patuxent River, MD 20670

RFQ D/B - P-3005 Child Development Center, Joint Base Andrews
Demolition, New Construction, Infrastructure - 26,069 SF
Post-Bid
$25,000,000 CJ est. value
Andrews Air Force Base, MD 20762

NMLPDC1 Modernize NPDS Corridors Replace NPDS Drinking Fountains Replace NPDS Carpet
Renovation
Results
$500,000 to $1,000,000 est. value
Bethesda, MD 20814

Provide and install 8 replacement coils in Wallops Flight Facility drycooler.
Renovation, Infrastructure
Design
$100,000 CJ est. value
Greenbelt, MD 20770

Last Updated 08/12/2023 12:34 AM
Project Title

B2272 Phase 3 Secure Projects

Physical Address View project details and contacts
City, State (County) Patuxent River, MD 20670   (Saint Marys County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Location of the Work: NAS Paxutent River, Bldgs. 2272 and 404 Description of the Work: This project reconfigures existing space within RADM William A. Moffett Bldg. 2272 and NAVAIR Admin Bldg. 404, into secured space at Naval Air Station (NAS) Patuxent River. In-House Design Build Budget Amount: The estimated Design Build Budget is $3 Million. NAICS CODE: 236220 Commercial and Institutional Building Construction Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government requires completion of construction within 547 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number: MD20230008 06/02/2023 applies to this work. See Attachment B. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award. The wage determination version in effect at the time of award shall apply to the work performed under this contract. Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers. Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries must be made in writing and shall be submitted via email using the Excel document provided as Attachment C to William.s.bryan6.civ@us.navy.mil no later than 1:00 p.m. local time on 2 August 2023. Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. Government response(s) will be published via amendment.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents